Tender Details
Particulars | Details |
---|---|
Title |
(666) Strengthening Of Existing Schools G.S.S.School Agewa
|
Description |
(666) Strengthening Of Existing Schools G.S.S.School Agewa
|
Organisation | Government of Rajasthan |
Tender Id | 2023_RCSCE_345633_5 |
Reference Number |
NIT No. 09 of 2023-24 ADPC Samagra Shiksha Pali |
Tender Fee | 1000 |
EMD | 26340 |
Tender Value | |
Place | ADPC Samagra Shiksha Pali |
Link | https://eproc.rajasthan.gov.in |
Start Date | June 23, 2023 15:30 |
End Date |
04/07/2023 ( Expired 686 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreWork of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Work of augmentation of existing 18 no. 33 kv sub-stations along with augmentation of associated 33 kv lines and civil works on turnkey basis within the jurisdiction of uhbvn under rdss.
Read moreStrengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreRenovation and modernization of existing electro-hydraulic governing system at lpph
Renovation and modernization of existing electro-hydraulic governing system for the 3 x60 mw generators at lower periyar hydro electric project (lphep), karimanal
Read moreReplacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh stps ckt 1st and ckt 2nd at suspension towers
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh-stps ckt 1st and ckt 2nd at suspension towers
Read moreof your Industry type