Tender Details

Particulars Details
Title
Stregthening To Ambadgaon Approch Road Km 1/00 To 2/500 Tal Dodamarg Odr 68
Description
Stregthening To Ambadgaon Approch Road Km 1/00 To 2/500 Tal Dodamarg Odr 68
Organisation RDD-CEO-SINDHUDURG | State Govt. and UT
Tender Id 2025_SINDH_1146171_10
Reference
Number
SZP/WD/TENDER/MSS/20/24-25
Tender Fee 1000
EMD 12100
Tender Value
Place DODAMARG
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1995729
Start Date February 05, 2025 21:00
End Date

20/02/2025 ( Expired 132 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Short term maintenance of nh-42 from km 137/500 to km 159/100 of uravakonda-krishnagiri road in (rnb) nh division ananthapuramu in the state of andhra pradesh

Short term maintenance of nh-42 from km 137/500 to km 159/100 of uravakonda-krishnagiri road in (rnb) nh division ananthapuramu in the state of andhra pradesh

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of cement concrete road work near h.no.58 (geet mohini gate mandir), k-1,k-2 park k sector ayodhya nagar ward 68 zone 16

Construction of cement concrete road work near h.no.58 (geet mohini gate mandir), k-1,k-2 park k sector ayodhya nagar ward 68 zone 16

Read more
Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Construction of 98.0 m 2-span steel truss bridge over abohar branch rd-180265 feet on link road jagraon to hathur to dallah, mallah, chakkar road t-01 from km. 0.000 to km. 24.580 under pmgsy-lll batch-3 in district ludhiana. package no. pb-10-135a

Read more
Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads

Strengthening of bahadurgarh ghanour road to ghanour via chappar manjoli (odr-37) in distt. sas nagar with 5 year maintenance (1 year defect liability period) under head 5054 rb-10 roads

Read more
Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Strengthening of mubarakpur to bhankharpur road rd 0.34 km to 1.60 km (odr-05) in distt. sas nagar with 5 year maintenance (1st year defect liability period under 5054 rb-10 roads)

Read more
S/r of nabha gobindgarh road to kalarmajri l-8.45 km mc bhadson g-2 under s/r scheme 2022-23, 2023-24 and 2024-25 distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th year maintenance)

S/r of nabha gobindgarh road to kalarmajri l-8.45 km mc bhadson g-2 under s/r scheme 2022-23, 2023-24 and 2024-25 distt. patiala. including maintenance for 5 year (1st year defect liability period and 2nd to 5th year maintenance)

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise