Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply Installation Testing And Commissioning Of 3 X300 K Va 3 Phase Double Con On Line Ups Systems In Parallel Along With Post Warranty Camc For Period Of 10 Years
|
Description |
Supply Installation Testing And Commissioning Of 3 X300 K Va 3 Phase Double Con On Line Ups Systems In Parallel Along With Post Warranty Camc For Period Of 10 Years
|
Organisation | Inter University Accelerator Centre | Central Govt. Ministry/Department |
Tender Id | 2025_IUAC_849119_1 |
Reference Number |
IUAC/NIT/18/GS/2024-25 |
Tender Fee | 10 |
EMD | 2.8 Lakh |
Tender Value | |
Place | IUAC, New Delhi |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892607 |
Start Date | February 14, 2025 15:30 |
End Date |
06/03/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Pre-dispatch inspection, supply, installation, testing, commissioning, training and warranty of plc based in cell equipment for production of iodine 131 and spares as per the attached specification
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreSurvey, supply, transportation, carriage, erection, testing and commissioning for 1 grievance of sh. ajay sharma 2creation of 25 kva ss ht/lt at w. no. 07 busnote3.creation of ss at w.no 3 kunsote 4.creation at naman 5. shifting of ht line mand ut
Creation of ss, ht ,lt line and shifting of line
Read moreSupply,installation,testing and commissioning of 750 kva silent dg as per cpcb norms with latest amendments
Supply,installation,testing and commissioning of 750 kva silent dg as per cpcb norms with latest amendments
Read moreof your Industry type