Tender Details
About Tender
🚨 Urgent Procurement Notice For Multi Gas Monitors 🚨 The Department Of Health Research, Under The Ministry Of Health And Family Welfare, Is Seeking Bids For The Supply Of Multi Gas Monitors Capable Of Detecting H2 S, Co, O2, Ch4, And Co2 Gases. 🛠️ 🗓️ Submission Deadline: July 16, 2024, 6:00 Pm Bids Must Include Detailed Specifications, Pricing, And Evidence Of The Equipment's Reliability And Accuracy. This Equipment Is Critical For Ensuring The Safety Of Personnel In Hazardous Environments. Keywords: Multi Gas Monitor, H2 S, Co, O2, Ch4, Co2, Gas Detection, Health And Safety, Department Of Health Research, Ministry Of Health And Family WelfareParticulars | Details |
---|---|
Title |
Multi Gas Monitor (For H2 S, Co, O2, Ch4, Co2 Gases Detection) With Pump
|
Description |
|
Organisation | Department of Health Research | Ministry of Health and Family Welfare |
Tender Id | GEM/2024/B/5091425 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | June 25, 2024 22:50 |
End Date |
16/07/2024 ( Expired 305 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning gas chromatogram with head space sampler and detectors (upgradable for ms)
Supply, installation, testing and commissioning gas chromatogram with head space sampler and detectors (upgradable for ms)
Read moreBess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Bess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Read moreProcurement of centrifugal self priming mono block pump with motor for pws and ahp, ktps, dvc
Read more
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.
Procurement of structural steel for installation of platform with hand railing along the pipe rack of asdl from stage-ii pump house, capex 25-26.
Read moreThermal gravimetric analyzer with differential scanning calorimetry (tga-dsc) for catalytic and gas
Read more
Eye operating microscope with side tube with lcd monitor with camera with co-axial illumination
Read more
Supply of argon gas 99.998% purity with h2o less than 4 ppm o2 less than 2 ppm in quards consisting
Read more
Supply delivery and fixing of horizontal split casing pump with a discharged 342 m3 / hr and with a head of 45mts with moor for 10 mld water treatment plant dowleswaram road in rmc.
Supply delivery and fixing of horizontal split casing pump with a discharged 342 m3 / hr and with a head of 45mts with moor for 10 mld water treatment plant dowleswaram road in rmc.
Read moreof your Industry type