Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Hard Stand, Rcc Retaining Wall, Drain And Drive Head Foundation For Conveyor Belt At 6/7 Incline Of Rajgamar Sub Area Of Korba Area.
|
| Description |
Providing Hard Stand, Rcc Retaining Wall, Drain And Drive Head Foundation For Conveyor Belt At 6/7 Incline Of Rajgamar Sub Area Of Korba Area.
|
| Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_SECL_297595_1 |
|
Reference Number |
SECL/GM/KA/C/e-Tender/23-24/43 Dt. 04.01.2024 |
| Tender Fee | 0 |
| EMD | 98000 |
| Tender Value | - |
| Place | Office of the General Manager Korba Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=308352 |
| Start Date | January 06, 2024 15:30 |
| End Date |
Expired
22/01/2024
Expired 998 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Replacement of two nos belt conveyor motor at 72l-11d 2nd belt conveyor, two nos starter running at 11( 2 )and72l belt conveyor at 3n4 incline ug of jhanjra project colliery
Read moreDismantling, repairing and refitting of shaft of drive drum of main incline conveyor of shyamsundarpur colliery under bankola area
Dismantling, repairing and refitting of shaft of drive drum of main incline conveyor of shyamsundarpur colliery under bankola area
Read moreLarge cidex steel tray,larynagoscope with blade 1 2 3 4,lma tube procoel supracoel no. 0 1 2 3 4,lox 2 percent jelly,lumber traction belt large,lumber traction belt medium,lumber traction belt small,mackintosh pvc disp,macro laryyeal tube 6 6.5 7 7.5,magils forcep,male catherter,malleable fistula probes,malleble stylet medium large set,medicine container,mercelence tape trubound,mersaline tape,micro drip set,microscop bull,monepolar cautery pencil,monopolarcaotery pencil,mva cannula no.7,mva syringe aspirator,mva syringe cannula 4 to 12,n 95 mask,nebulizer machine,nebulizer mask set c chamber,neck collar hard,needle holder 6 inch,needle holder 8 inch,neo cathmount,non tooth forceps 6 inch,nose plyer,nrsm mask,o2 connector pin adopter,o2 cylender hey,o2 cylinder stand with wheels,o2 nozzle,on off kit 50,oxygen flow meter set,oxygen mask no.0 1 and 2 latex,oxygen mask set adult,oxygen mask set pead,oxygen mox regulator 265b,oxygen port adopter,oxygen pronge nasal canula,p.p.e kit,palin sheet,patient c
Large cidex steel tray,larynagoscope with blade 1 2 3 4,lma tube procoel supracoel no. 0 1 2 3 4,lox 2 percent jelly,lumber traction belt large,lumber traction belt medium,lumber traction belt small,mackintosh pvc disp,macro laryyeal tube 6 6.5 7 7.5,magils forcep,male catherter,malleable fistula probes,malleble stylet medium large set,medicine container,mercelence tape trubound,mersaline tape,micro drip set,microscop bull,monepolar cautery pencil,monopolarcaotery pencil,mva cannula no.7,mva syringe aspirator,mva syringe cannula 4 to 12,n 95 mask,nebulizer machine,nebulizer mask set c chamber,neck collar hard,needle holder 6 inch,needle holder 8 inch,neo cathmount,non tooth forceps 6 inch,nose plyer,nrsm mask,o2 connector pin adopter,o2 cylender hey,o2 cylinder stand with wheels,o2 nozzle,on off kit 50,oxygen flow meter set,oxygen mask no.0 1 and 2 latex,oxygen mask set adult,oxygen mask set pead,oxygen mox regulator 265b,oxygen port adopter,oxygen pronge nasal canula,p.p.e kit,palin sheet,patient c
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreStructural steel and rcc foundation works for strengthening and extension of conveyor belt structure at 6 and 7 incline at rajgamar sub area under korba area.
Structural steel and rcc foundation works for strengthening and extension of conveyor belt structure at 6 and 7 incline at rajgamar sub area under korba area.
Read moreRepairing of damaged boundary wall of 6/7 incline at rajgamar subarea under korba area.
Repairing of damaged boundary wall of 6/7 incline at rajgamar subarea under korba area.
Read moreSealing of mine entry at incline no. 8/9 at rajgamar subarea of korba area.
Sealing of mine entry at incline no. 8/9 at rajgamar subarea of korba area.
Read moreConstruction of bituminous road from 6 and 7 incline to 10 number incline at rajgamar sub area under korba area.
Construction of bituminous road from 6 and 7 incline to 10 number incline at rajgamar sub area under korba area.
Read moreof your Industry type