Tender Details

Particulars Details
Title
Construction Of 4 Lane 50 Mtr Synthetic Running Track, Out Door Led Screen And Land Scapping Work At Birsa Munda Football Stadium, Morahbadi, Ranchi.
Description
Construction Of 4 Lane 50 Mtr Synthetic Running Track, Out Door Led Screen And Land Scapping Work At Birsa Munda Football Stadium, Morahbadi, Ranchi.
Organisation Sports Authority of Jharkhand | State Govt. and UT
Tender Id 2025_SAJHA_98562_1
Reference
Number
15/PR/SAJHA/2024-25/213
Tender Fee 10000
EMD 2.87 Lakh
Tender Value
Place Ranchi, Jharkhand
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=132481
Start Date February 17, 2025 14:30
End Date

01/03/2025 ( Expired 99 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture

Read more
Construction of 50 bedded critical care block g plus 3 at malda medical college and hospital_malda _sitc of lift

Name of work construction of 50 bedded critical care block g_plus_3 at malda medical college and hospital_malda _ sitc of lift

Read more
Internal electrification in b type shop 05 nos c type shop 12 nos in grain and sfof 17 nos bulk head led light extension of lt line by sf of steel tubular pole 4 nos sf of led street light 04 nos pole painting and cabling etc work at nmy charra

Internal electrification in b type shop 05 nos c type shop 12 nos in grain and sfof 17 nos bulk head led light extension of lt line by sf of steel tubular pole 4 nos sf of led street light 04 nos pole painting and cabling etc work at nmy charra

Read more
Construction of land scaping, paver block and drain at home guard, dhurwa in the district of ranchi

Construction of land scaping, paver block and drain at home guard, dhurwa in the district of ranchi

Read more
Construction of new boundary wall and toilet and repair work of old boundary wall and toilet at central storage, hotwar, ranchi in the district of ranchi

Construction of new boundary wall and toilet and repair work of old boundary wall and toilet at central storage, hotwar, ranchi in the district of ranchi

Read more
Repair work of floor and window of b type, a type quarter and construction of drain for new barrack at home guard, dhurwa in the district of ranchi

Repair work of floor and window of b type, a type quarter and construction of drain for new barrack at home guard, dhurwa in the district of ranchi

Read more
Construction of 400 mtr cinder athletic track at guru teg bhadur stadium iti budhlada

Construction of 400 mtr cinder athletic track at guru teg bhadur stadium iti budhlada

Read more
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire

Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise