Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Echp Ii Complete Overhauling Of Lt Motors Which Are In Service Ranging From 1.5 Kw To 50 Kw At Various Location
|
| Description |
Echp Ii Complete Overhauling Of Lt Motors Which Are In Service Ranging From 1.5 Kw To 50 Kw At Various Location
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_462163_1 |
|
Reference Number |
CE/SE/MI/TTPS/92/2024-2025 |
| Tender Fee | 0 |
| EMD | 1400 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=549239 |
| Start Date | July 12, 2024 22:30 |
| End Date |
Expired
31/07/2024
Expired 806 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, rewinding of 8 nos squirrel case lt induction motors ( 2 x 90 kw , 4 x 37 kw and 2 x 22 kw ) of chp under dudhichua project.
Repairing, rewinding of 8 nos squirrel case lt induction motors ( 2 x 90 kw , 4 x 37 kw and 2 x 22 kw ) of chp under dudhichua project.
Read moreTtps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Ttps operation circle cad aoh complete overhauling of 110 kw auxiliary cooling water pump motors of unit iii at acwph
Read moreShifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Shifting/dismantling of lt/ht lines which are creating hurdles during road widening from starting point of cbi phatak rob to 7 no. bus stand, mahal road, zone-9, jda, jaipur.
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreSupply and fixing testing and calibration including necessary transport of direct connected bi-directional energy meter solar meter work to be excecuted as mentioned in the scope of work,sands amr gprs modem with sim card slot complete,aggregate dcu with 4g commuinication,sim charges and band with charges per month per location per annum,modem and dcu installation and configuration charges complete,m and l for box for aggregator at tneb rmg panel complete,cloud charges for 5 years dcu,lt whole current meter complete,supply and fixing of single compartment powder coated gasket sealed lt metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work,calibration of lt bi directional meter fixed by tneb work to be excecuted as mentioned in the scope of work including provision of and ct and pts for complete system all as specified and as directed.
Supply and fixing testing and calibration including necessary transport of direct connected bi-directional energy meter solar meter work to be excecuted as mentioned in the scope of work,sands amr gprs modem with sim card slot complete,aggregate dcu with 4g commuinication,sim charges and band with charges per month per location per annum,modem and dcu installation and configuration charges complete,m and l for box for aggregator at tneb rmg panel complete,cloud charges for 5 years dcu,lt whole current meter complete,supply and fixing of single compartment powder coated gasket sealed lt metering box with stand for housing solar net metering with provision of work to be excecuted as mentioned in the scope of work,calibration of lt bi directional meter fixed by tneb work to be excecuted as mentioned in the scope of work including provision of and ct and pts for complete system all as specified and as directed.
Read moreEchp-ii- complete overhauling of lt motors of capacity ranging from 0.37 kw to 93 kw, 415v, 50 hz provided at conveyor-48a/b to conveyor-68 scoop motors, oil pump motors, oil cooler motors, flow divider chute motor and booster pump motors.
Echp-ii- complete overhauling of lt motors of capacity ranging from 0.37 kw to 93 kw, 415v, 50 hz provided at conveyor-48a/b to conveyor-68 scoop motors, oil pump motors, oil cooler motors, flow divider chute motor and booster pump motors.
Read morePrive maintenance/overhauling and rewinding of various capacities lt motors ranging from fractional kw to 125 kw lt motors installed in chp, ctps, htpp
Prive maintenance/overhauling and rewinding of various capacities lt motors ranging&#x0d from fractional kw to 125 kw lt motors installed in chp, ctps, htpp
Read morePrive maintenance overhauling and rewinding of various capacities lt motors ranging from fractional kw to 125 kw lt motors installed in chp ctps htpp area
Prive maintenance overhauling and rewinding of various capacities lt motors ranging from fractional kw to 125 kw lt motors installed in chp ctps htpp area
Read moreRoutine maintenance and overhauling of various capacities lt motors ranging from fractional kw to 160 kw lt motors of unit 3 4 of 2x210 mw, ptpp parichha jhansi.
Routine maintenance and overhauling of various capacities lt motors ranging from fractional kw to 160 kw lt motors of unit 3 4 of 2x210 mw, ptpp parichha jhansi.
Read moreEchp-i- replacement of ht/lt motors by spare motors, transporting of released motors to convenient location, complete overhauling of motors and further transporting nearby to bed location at conveyor-13a,14 and 15 in red gate area.
Echp-i- replacement of ht/lt motors by spare motors, transporting of released motors to convenient location, complete overhauling of motors and further transporting nearby to bed location at conveyor-13a,14 and 15 in red gate area.
Read moreof your Industry type