Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hay Grass (Loose And Bundle),Hay Grass (Loose And Bundle),Hay Grass (Loose And Bundle)
|
| Description |
|
| Organisation | Department of Defence | Ministry of Defence |
| Tender Id | GEM/2025/B/6463496 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | 2 Crore |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | August 16, 2025 16:12 |
| End Date |
Expired
06/09/2025
Expired 400 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Maintenance of entire external area, including horticulture, plantation, gardening, necessary pest control, grass area, parking areas, celebration ground, parade ground, pond, rain water harvesting system, drainage system, swimming pool, all open spaces and all rest areas (excluding buildings) etc. of bihar police academy, rajgir, nalanda (bihar) (for upcoming 5 years)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type