Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Arakkonam: Supply, Erection, Testing And Commissioning Of Electrical Power Supply Arrangements In Platform And Yard, Service Buildings, Lighting Arrangements, Water Pumping Arrangements For 3rd And 4th Line Connectivity To Road No.1 And 2 At Arakkonam Yard.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74546739 |
Reference Number |
E-HQ-CN-MS-EOT7-2024-25 |
Tender Fee | 0 |
EMD | 2.48 Lakh |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/082024/74546739/viewNitPdf_4532635.pdf |
Start Date | July 26, 2024 20:42 |
End Date |
19/08/2024 ( Expired 323 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreFabrication, manufacture, supply, erection, testing and commissioning of 33 kv ss 2 nos 8 mva prtr, associated equipments, lines at pernaickenpatti in virudhunagar edc.
Fabrication, manufacture, supply, erection, testing and commissioning of 33 kv ss 2 nos 8 mva prtr,associated equipments lines at pernaickenpatti in virudhunagar edc.
Read moreSupply,installation,testing and commissioning of materials for 11kv 2 pole dp structure of yard 1 and yard 2 at niot,chennai
Supply,installation,testing and commissioning of materials for 11kv 2 pole dp structure of yard 1 and yard 2 at niot,chennai
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india
World bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply, including headworks (intake well, approach bridge, raw water pumping main, water treatment plant, clear water reservoir, clear water pump house (civil works) and other ancillary works) and 7 years om (intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiii)
Read moreWorld bank and adb financed amaravati capital city development program related survey, investigation, design, construction of balance works, testing, commissioning of water supply works (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, ai based cwims and cmms and 7 years of om for entire water supply (except intake to wtp) on dbo basis in amaravati
Survey, investigation, design, construction of balance works, testing, commissioning of water supply works (clear water pump house (electro-mechanical works), clear water pumping main, cushion tanks, semi underground reservoirs, integration with entire water supply, other ancillary works, scada, a.i based centralized water information management system (cwims) computerized maintenance management system (cmms) and 7 years om for entire water supply (except intake to wtp) on design, build and operate (dbo) basis in amaravati capital city of andhra pradesh state, india (package xxxxiv)
Read moreSurvey, supply, transportation, carriage, erection, testing and commissioning for 1 grievance of sh. ajay sharma 2creation of 25 kva ss ht/lt at w. no. 07 busnote3.creation of ss at w.no 3 kunsote 4.creation at naman 5. shifting of ht line mand ut
Creation of ss, ht ,lt line and shifting of line
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line at rasul nagar 2nd line and bongarala beedu old vehicle shed road for avoid contamination of water and improvement of water supply in div no.53 and 55 under ae-14 section.
Read moreBudgetary offer for supply, erection, testing and commissioning of 33/0.433kv, 2500kva electrical substation including civil works as per technical specification in jnpa
Budgetary offer for supply, erection, testing and commissioning of 33/0.433kv, 2500kva electrical substation including civil works as per technical specification in jnpa
Read moreWpt. including necessary repairs water supply drainage installation and other allied civil work in resi. buildings of kotra sultanabad section no.1 and 2 under pwd. city sub dn. no.3 bhopal.
Wpt. including necessary repairs water supply drainage installation and other allied civil work in resi. buildings of kotra sultanabad section no.1 and 2 under pwd. city sub dn. no.3 bhopal.
Read moreof your Industry type