Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation Of 33k V Substation Pariyaram(kannur) To 110k V Construction Of 3km 110k V Dc Line From Mudikanam To Pariyaram Substation Using Al59 Wolf Equivalent Conductor.
|
| Description |
Upgradation Of 33k V Substation Pariyaram(kannur) To 110k V Construction Of 3km 110k V Dc Line From Mudikanam To Pariyaram Substation Using Al59 Wolf Equivalent Conductor
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2024_KSEB_688765_1 |
|
Reference Number |
T-2/TD-KNR/2024-25 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | |
| Place | Pariyaram Substation near Pariyaram Medical colleg |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1071976 |
| Start Date | September 06, 2024 15:30 |
| End Date |
Expired
26/09/2024
Expired 628 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 33kv line for 33/11kv substation bilarideeh (jiwadhipur to jasori), dist. chandauli on semi turnkey basis.
Construction of 33kv line for 33/11kv substation bilarideeh (jiwadhipur to jasori), dist. chandauli on semi turnkey basis.
Read moreConstruction of additional 5mva for 33/11kv substation newadiya, leduka (machhaligaw), jaunpur and construction of 11kv line from 33/11kv subsatation leduka, distt. jaunpur on semi turnkey basis.
Construction of additional 5mva for 33/11kv substation newadiya, leduka (machhaligaw), jaunpur and construction of 11kv line from 33/11kv subsatation leduka, distt. jaunpur on semi turnkey basis.
Read moreDesign supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Design supply construction testing and commissioning of 3 nos 11kv and 2 nos 33kv overhead transmission line to ug cable at various locations for rly track crossing in sbhr padil rly sectn of swr
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreConstruction of 3km 110kv dc line from mudikanam to pariyaram substation(kannur) using al-59 wolf equivalent conductor
Upgradation of 33kv substation pariyaram(kannur) to 110kv- construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor.
Read moreUpgradation of 33kv substation pariyaram(kannur) to 110kv- construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor
Upgradation of 33kv substation pariyaram(kannur) to 110kv- construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor.
Read moreUpgradation of 33kv substation pariyaram(kannur) to 110kv- construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor
Construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor
Read moreUp gradation of 33kv substation pariyaram to110kv-construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor.
Up gradation of 33kv substation pariyaram to110kv-construction of 3km 110kv dc line from mudikanam to pariyaram substation using al-59 wolf equivalent conductor.
Read moreTc section taliparamba- upgradation of 33kv substation pariyaram to 110kv level and construction of 110kv dc line from mudikanam to pariyaram- tree cutting along the core width of right of way
Tc section taliparamba- upgradation of 33kv substation pariyaram to 110kv level and construction of 110kv dc line from mudikanam to pariyaram- tree cutting along the core width of right of way
Read moreCapacity enhancement of existing 1enmj(elankur-manjeri), 1enml(elankur-malappuram) and 1mlmj(malappuram-manjeri) lines by replacing the existing 4.7km dc acsr wolf conductor with al59
Reconductoring existing 110kv dc line from elankur to manjeri using al59 conductor by replacing existing wolf conductor.
Read moreof your Industry type