Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Preventive Maintenance And Emergency Breakdown Works In In 921 K Ms Of Eht Lines Under Works Contract In Trichy 230 Kv And 110 Kv Lines Sections (Trichy Metro Edc)
|
| Description |
Preventive Maintenance And Emergency Breakdown Works In In 921 K Ms Of Eht Lines Under Works Contract In Trichy 230 Kv And 110 Kv Lines Sections (Trichy Metro Edc)
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_370449_1 |
|
Reference Number |
SEOTRY-ET19-202324 |
| Tender Fee | 0 |
| EMD | 70800 |
| Tender Value | - |
| Place | O/o SE Operation Trichy |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 16, 2023 15:30 |
| End Date |
Expired
30/10/2023
Expired 1085 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance contract preventive of 132 kv lines under 132kv ss purkul
Annual maintenance contract preventive of 132 kv lines under 132kv ss purkul
Read moreAnnual maintenance contract preventive of 132 kv bindal rishikesh and bindal majra transmission lines
Annual maintenance contract preventive of 132 kv bindal rishikesh and bindal majra transmission lines
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - emergency breakdown of220 & 132 kv lines empanellenment of contractors/ firms for the emergency work of attending breakdown due to failure of insulators/ snapping of co..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - emergency breakdown of220 & 132 kv lines empanellenment of contractors/ firms for the emergency work of attending breakdown due to failure of insulators/ snapping of co..
Read moreDdc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Ddc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreConstruction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina
Construction of rr masonry/ rcc revetment wall/ hume pipe culvert at various tower 06 no. tower loc. of various 05 no. 220/132 kv ehv lines through work contract under eht-maint., division, itarsi and bina
Read moreSurvey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Survey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Read morePreventive maintenance and emergency breakdown works in in 921 kms of eht lines under works contract in trichy 230 kv and 110 kv lines sections (trichy metro edc)
Preventive maintenance and emergency breakdown works in in 921 kms of eht lines under works contract in trichy 230 kv and 110 kv lines sections (trichy metro edc)
Read morePreventive maintenance and emergency breakdown works in 958 kms of eht lines under works contract in perambalur and kallakudy lines sections (perambalur edc) )
Preventive maintenance and emergency breakdown works in 958 kms of eht lines under works contract in perambalur and kallakudy lines sections (perambalur edc)
Read morePreventive maintenance and emergency breakdown works in 958 kms of eht lines under works contract in perambalur and kallakudy lines sections (perambalur edc)
Preventive maintenance and emergency breakdown works in 958 kms of eht lines under works contract in perambalur and kallakudy lines sections (perambalur edc)
Read moreof your Industry type