Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Nh 222 To Nirgudpada Approach Road In Taluka Murbad, District Thane.(Under 5054 Tribal Work)
|
| Description |
Construction Of Nh 222 To Nirgudpada Approach Road In Taluka Murbad, District Thane.(Under 5054 Tribal Work)
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_PWR_919659_8 |
|
Reference Number |
pwd2thane/08/2023-24 |
| Tender Fee | 590 |
| EMD | 31000 |
| Tender Value | |
| Place | Executive Engineer, P.W.Division, No.2, Thane |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | June 27, 2023 15:30 |
| End Date |
Expired
10/07/2023
Expired 1089 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreUnder district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7
Under district sultanpur, construction of cc road from dulhapur gram sabha to maharajganj road, lot no 7&#x0d
Read moreConstruction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Construction of rcc drain at km 140, km 183, km 204 and guard toe wall of at ch. 151.200 of nh-23 (new nh-143) under nh division, gumla for the year 2025-26.
Read moreConstruction of seismic stations, approach roads, and associated infrastructure in the technical area of rrcat, indore.
Construction of seismic stations, approach roads, and associated infrastructure in the technical area of rrcat, indore.
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreUnder district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4
Under district sultanpur, construction of interlocking road from haripur-bharkhare to the house of wrestler veer baba to abhimanyu verma house in village alipur under khand bhadaiya, lot no 4&#x0d
Read moreConstruction of ht covered conductor and ht abc for in connecting feeder through nh
Construction of ht covered conductor and ht abc for in connecting feeder through nh
Read moreConstruction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type