Tender Details

Particulars Details
Title
Thanjavur District Kumbakonam Block Construction Of Compound Wall At Kalaignar Century Library In Valaiyapettai Panchayat Under Sfc (District Panchayat) 2024 2025
Description
Thanjavur District Kumbakonam Block Construction Of Compound Wall At Kalaignar Century Library In Valaiyapettai Panchayat Under Sfc (District Panchayat) 2024 2025
Organisation Rural Development and Panchayat Raj Department | State Govt. and UT
Tender Id 2024_RDTN_493988_1
Reference
Number
Rc.No.3303/2024/A7 dated 04.10.2024
Tender Fee 0
EMD 16500
Tender Value
Place Panchayat Union Office ,Kumbakonam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=586919
Start Date October 16, 2024 14:30
End Date

24/10/2024 ( Expired 235 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Construction of 1.500 km internal road in 13 brtf and allied units on nimmu padam darcha road at km 152.00 under project yojak in ladakh

Read more
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Construction of rcc draintotal 8.06 km of nh-512 nh division vii

Construction of rcc drain for a total 8.06 km of nh-512 under nh div. no. vii, p.w. (roads)directorate in the district of dakshin dinajpur west bengal on epc mode job no.512/wb/2025-26/569

Read more
Repairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja

Repairs to hardstanding, path, interlocking tiles, chequered tiles, perimeter compound wall, security fencing, barbed wire, security gates, baby wall, temproary sheds at various loc of nad expl, non expl and tunir area under age b/r-ii at ns karanja

Read more
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Read more
Construction of rrm protection wall at new tower no.: 04

Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise