Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Conc Lane From H/O Mohd Yaqoob Bhat To H/O Zahoor Ah Wani H/Phanoo
|
| Description |
Construction Of Conc Lane From H/O Mohd Yaqoob Bhat To H/O Zahoor Ah Wani H/Phanoo
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_221094_21 |
|
Reference Number |
nit 76 A of 2023-24 |
| Tender Fee | 200 |
| EMD | 0 |
| Tender Value | |
| Place | EXECUTIVE ENGINEER REW DIVISION SHOPIAN |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | July 12, 2023 23:30 |
| End Date |
Expired
20/07/2023
Expired 1101 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of conc lane from h/o mohd yaqoob bhat to h/o zahoor ah wani h/phanoo
Construction of conc lane from h/o mohd yaqoob bhat to h/o zahoor ah wani h/phanoo
Read moreImpt of lane from h/o mohd akbar wani to h/o zahoor ahmad ganie
Impt of lane from h/o mohd akbar wani to h/o zahoor ahmad ganie
Read moreImpt of lane from h/o mohd akbar wani to h/o zahoor ahmad ganie
Impt of lane from h/o mohd akbar wani to h/o zahoor ahmad ganie
Read moreCo tile lane from ho mohd yaqoob bhat to shopkeeper muneer ah bhat at naroo
Co tile lane from ho mohd yaqoob bhat to shopkeeper muneer ah bhat at naroo
Read moreRe-construction of lane drain from h/o hatim ali upto h/o zahoor ah. bhat at chandapora habbakadal
Re-construction of lane drain from h/o hatim ali upto h/o zahoor ah. bhat at chandapora habbakadal
Read moreConstruction of conc lane from h/o nazir ah dar to h/o mohd rafiq dar at h/phanoo
Construction of conc lane from h/o nazir ah dar to h/o mohd rafiq dar at h/phanoo
Read moreof your Industry type