Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing,Reconditioning Of The Outgoing Breaker Acb For Ps 4, 9 And 11 Rating Is 1000 A, 1500 A And 800 A Respectively 415 V Make Ngef Installed In The 5 Iv Panel Of Lt Mcc At The Ps 5 Building Of Rajrappa Washery
|
| Description |
Repairing,Reconditioning Of The Outgoing Breaker Acb For Ps 4, 9 And 11 Rating Is 1000 A, 1500 A And 800 A Respectively 415 V Make Ngef Installed In The 5 Iv Panel Of Lt Mcc At The Ps 5 Building Of Rajrappa Washery
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_287699_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/65 dt 01.09.2023 |
| Tender Fee | - |
| EMD | 3500 |
| Tender Value | - |
| Place | SO EnM OFFICE |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 02, 2023 23:30 |
| End Date |
Expired
11/09/2023
Expired 1130 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Repairing, overhauling of ps-8 and loading section 02 mva transformer make - ngef, 6.6 kv to 433v at madhuban coal washery under block-ii area, bccl.
Read moreComplete repairing, overhauling of 6.6kv, 1250 amps ngef make ps-24, ps-9, ps-8 and loading section low oil circuit breaker with its panel in loading section at madhuban coal washery under block-ii area, bccl.
Complete repairing, overhauling of 6.6kv, 1250 amps ngef make ps-24, ps-9, ps-8 and loading section low oil circuit breaker with its panel in loading section at madhuban coal washery under block-ii area, bccl.
Read moreComplete repairing and overhauling of 06 nos, acb 3200amp, 415v installed at main washery lt mcc
Complete repairing and overhauling of 06 nos, acb 3200amp, 415v installed at main washery lt mcc
Read moreRepairing and maintenance of 6.6kv, 2000a switchgear of incomer no. 1, make-ngef in ht mcc and mocb breaker, 6.6kv, 1250a of pre-washery at kedla washery
Repairing and maintenance of 6.6kv, 2000a switchgear of incomer no. 1, make-ngef in ht mcc and mocb breaker, 6.6kv, 1250a of pre-washery at kedla washery
Read moreOld cable dismentalling,relaying at different places in the ps-5 main building n ps-14 of rajrappa washery project.
Old cable dismentalling,relaying at different places in the ps-5 main building n ps-14 of rajrappa
 washery project.
Read moreIctp 100 a 415 v 4 pole,200 a busbar insulator of flp acb,200 a bus to lower chamber outgoing insul
Read more
Repairing, maintenance and reconditioning of the lt breakers ( acb) 415v, 3000a make-ngef installed in the incomer - i n ii of all the main mcc panels 5/i, 5/ii 5/ill and 5/iv installed in the lt mcc room of the main building of washery project
Repairing, maintenance and reconditioning of the lt breakers ( acb) 415v, 3000a make-ngef installed in the incomer - i n ii of all the main mcc panels 5/i, 5/ii 5/ill and 5/iv installed in the lt mcc room of the main building of washery project
Read moreDismantling and fitting of bearing 22228 and 22220 in tail drum of 1103 and snub drum of loading and raw coal section, respectively, of rajrappa washery.
Dismantling and fitting of bearing 22228 and 22220 in tail drum of 1103 and snub drum of loading and raw coal section, respectively, of rajrappa washery.
Read moreof your Industry type