Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Echp Ii Load Test Of 20 T, 8 T,5 T,3 T 2 T Capacity Electric Hoists In The Conveyor System From Conveyor 48 A B To Conveyor 68.
|
Description |
Ttps Echp Ii Load Test Of 20 T, 8 T,5 T,3 T 2 T Capacity Electric Hoists In The Conveyor System From Conveyor 48 A B To Conveyor 68.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_532445_1 |
Reference Number |
CE/SE/MI/TTPS/183/2024-2025 |
Tender Fee | 0 |
EMD | 2900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=633750 |
Start Date | March 14, 2025 16:30 |
End Date |
28/03/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Certain repairs to sewage system and other misc repair in aor of age b/r-ii under ge narangi
Certain repairs to sewage system and other misc repair in aor of age b/r-ii under ge narangi
Read moreCleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Cleaning and repairs to area drainage, sewage system including cleaning of septic tanks by mechanical means in zone b and e area under ge chennai
Read moreTtps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Read moreEchp-ii- reconditioning and overhauling of sc-9 model scoop type fluid coupling released from conveyor-68a b drives.
Echp-ii- reconditioning and overhauling of sc-9 model scoop type fluid coupling released from conveyor-68a b drives.
Read moreEchp-ii- releasing of 3c x 95 sq.mm aluminium xlpe lt cable from conveyor-65,66 67 and laying for 2 nos. 15 ton hoists in conveyor-69 70 and magnetic separator in conveyor-72 tail end including supply of cable joint kits and cable tray clamps.
Echp-ii- releasing of 3c x 95 sq.mm aluminium xlpe lt cable from conveyor-65,66 67 and laying for 2 nos. 15 ton hoists in conveyor-69 70 and magnetic separator in conveyor-72 tail end including supply of cable joint kits and cable tray clamps.
Read moreEchp-ii- overhauling and load testing of 10 ton, 7.5 ton, 5 ton and 3 ton capacity chain blocks at conveyor-72,73,64,61,48a 48b.
Echp-ii- overhauling and load testing of 10 ton, 7.5 ton, 5 ton and 3 ton capacity chain blocks at conveyor-72,73,64,61,48a 48b.
Read moreRemedial measures to rcc psc structures of coal jetty 1 conveyor system in between coal jetty - i conveyor - 13 a approach span 1 3 of ttps in red gate area north break water voc port at echs areas
Remedial&#x0d measures to rcc psc structures of coal jetty 1 conveyor&#x0d system in between coal jetty - i conveyor - 13 a approach&#x0d span 1 3 of ttps in red gate area north break water voc&#x0d port at echs areas
Read moreRemedial measures to rcc psc structures of coal jetty 1 conveyor system conveyor - 13 a (span 2 - 4) from coal jetty 1 ttps in red gate area north break water voc port at echs areas
Remedial&#x0d measures to rcc psc structures of coal jetty 1 conveyor&#x0d system conveyor - 13 a (span 2 - 4) from coal jetty 1 ttps in&#x0d red gate area north break water voc port at echs areas
Read moreEchp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Echp-ii- dismantling and renewal of existing worn out support i beam, tripper chute floor and walkways structures in conveyor-68 by new sh materials
Read moreEchp-ii- providing rubber lagging of various pulleys in conveyor belts of echp-ii system.
Echp-ii- providing rubber lagging of various pulleys in conveyor belts of echp-ii system.
Read moreof your Industry type