Tender Details

Particulars Details
Title
Construction Of Rub (Pre Cast Rcc Box Culvert) At Km 201/5 6 Between Lc 176 And 179 C On Hmh Sgnr Railway Track, Hanumangarh Junction
Description
Construction Of Rub (Pre Cast Rcc Box Culvert) At Km 201/5 6 Between Lc 176 And 179 C On Hmh Sgnr Railway Track, Hanumangarh Junction
Organisation DLB | State Govt. and UT
Tender Id 2025_DLB_445640_1
Reference
Number
NIT 67/2024-25 (17991-17999 Date 30/01/2025)
Tender Fee 4000
EMD 7.71 Lakh
Tender Value
Place HANUMANGARH
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=800177
Start Date February 03, 2025 20:30
End Date

25/02/2025 ( Expired 78 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

C/o infrastructure and other development work at rangmanch gad 15016 feet above msl upto 6 feet snow accumulation in winter and the site distance is 169 km from uttarkashi by road upto sumla and 20km on ops track upto rangmachgad post of 35th bn ukd

Read more
Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road

Design, supply and fixing of pre-cast rcc box culvert size 2.00 m x 2.00 m (nhsl specification 7.45 mtr width) including earth work excavation, pcc bed and protection works between km 0.00 to km 14.350 on puwarti-gomaguda road

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur

Construction of rob at lc 67-a saligrampura phatak between km 107/5 and 107/6 on jaipur sawaimadhopur (jp-swm) railway line in zone-14, jda jaipur

Read more
Improvement of black spot on jawalamukhi dehra jawali raja ka talab road mdr-80 km. 79/180 to 79/600.

Construction of 1.00 meter span rcc box culvert at rd. 67/350, 67/840 and cc pavement at rd. 67/850 to 67/853.75).

Read more
Selection of contractor for construction of external and internal rcc drain and box culvert at i.a. m.g. road (phase-i,ii and iii) distt. hapur (aiim 3) on epc basis

Selection of contractor for construction of external and internal rcc drain and box culvert at i.a. m.g. road (phase-i,ii and iii) distt. hapur (aiim 3) on epc basis

Read more
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise