Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Doli Fee Plaza At Km 174.875 For The Two/Four Lane With Paved Shoulder Section From Km 140.000 To Km 225.615 Of Nh 112 In Rajasthan
|
Description |
Engagement Of User Fee Collection Agency On The Basis Of Cb Through E Tender For Doli Fee Plaza At Km 174.875 For The Two/Four Lane With Paved Shoulder Section From Km 140.000 To Km 225.615 Of Nh 112 In Rajasthan
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | July 09, 2025 14:30 |
End Date |
22/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Rfp for work of improvement and up-gradation to four lane with paved shoulder configuration from design km. 40.000 (kodarkoot) to design km. 66.375 (bela chowk) of nh-91a in the state of uttar pradesh on hybrid annuity model (ham) basis.
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48
Consultancy services of independent engineer for upgradation to four lane with paved shoulders divided carriageway from design km 0.000 to km 37.087 of pardi nh-48 junction-sukesh-nanapondha-kaprada section of nh-848 in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar- kalavad section of nh-151k
Consultancy services of independent engineer for upgradation to two lane with paved shoulder of porbandar-bhanvad-jamjodhpur-kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat
Read moreConsultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Consultancy services of independent engineer for upgradation to four lane with paved shoulder of kalavad- jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat
Read moreConsultancy services for authority engineer for supervision of rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 design chainage from km 71.300 to km 95.947 paligad to jankichatti
Rehabilitation and up-gradation from single lane to two lanes with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConsultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu
Read moreof your Industry type