Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Street By C.C P Atka P Ur F Rom H.N 19/38 To 19/27 And H.N 19/32 In Ward 94 Under Zone 1
|
Description |
Improvement Of Street By C.C P Atka P Ur F Rom H.N 19/38 To 19/27 And H.N 19/32 In Ward 94 Under Zone 1
|
Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
Tender Id | 2025_NNKAN_1018409_1 |
Reference Number |
375/AA-1/2024-25 |
Tender Fee | 1180 |
EMD | 50250 |
Tender Value | |
Place | kanpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1836119 |
Start Date | March 19, 2025 17:30 |
End Date |
29/03/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreLong term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Long term rectification of morth identified blackspots by construction of lvup vup n fob under the project maharashtra karnataka border sangareddy section of nh65from km.352.188 to km.497.174 in the state of karnataka and telangana
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreDesign and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Design and constr of 35 m span psc maj pmt br with open foundation over thangeni nallah incl proof check and ssi report at km 72 pt 550 on sktt rd under 94 rcc 38 brtf rd of project deepak in hp state
Read moreOne time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
One time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConveyance of outward surface postal mails from foreign post office, v.d.bhavan, ballard estate, mumbai-1 to foreign destinations by sea mail on lcl and 20 and 40 ft fcl basis
Conveyance of outward surface postal mails from foreign post office, v.d.bhavan, ballard estate, mumbai-1 to foreign destinations by sea mail on lcl and 20 ft and 40 ft fcl basis
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreConstruction of road from sunil to rakesh kurmi, yashoda to college road, vikash to jyoti, mulchand to prashant, jatav ji to mukesh khair and vikas to prakash in jagdish ward, nagar palika parishad, gadarwara
Construction of road from sunil to rakesh kurmi, yashoda to college road, vikash to jyoti, mulchand to prashant, jatav ji to mukesh khair and vikas to prakash in jagdish ward, nagar palika parishad, gadarwara
Read moreof your Industry type