Tender Details
Particulars | Details |
---|---|
Title |
Installation Of 03 Nos. Of Diesel Engine 1000 Gpm Pump In Different Places Of Mines Arrangement Of Connection With Pipelines Of 6 Inch Dia And 4 Inch Dia Pipeline (300 Mtr. Each Approx.) For Supply Water In Ob Dump Miyawaki Tree Plantation
|
Description |
Installation Of 03 Nos. Of Diesel Engine 1000 Gpm Pump In Different Places Of Mines Arrangement Of Connection With Pipelines Of 6 Inch Dia And 4 Inch Dia Pipeline (300 Mtr. Each Approx.) For Supply Water In Ob Dump Miyawaki Tree Plantation
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_321434_1 |
Reference Number |
GM(AC)/SO(EnM)/e-NIT/24-25/30 |
Tender Fee | 0 |
EMD | 3400 |
Tender Value | |
Place | Amrapali- Chandragupta Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=333185 |
Start Date | November 19, 2024 17:00 |
End Date |
28/11/2024 ( Expired 145 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreShifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Shifting of 2nd pump of 1000 gpm, make - kirloskar oil engines itd. from one place to other place within 40 mtrs. radius, due to increased water level in sump also laying and welding of 8 inch dia. 30 mtrs, pipeline new extension near pump 34 delive
Read moreRepairing of pipeline used for supply of domestic water supply to nbcc colony(parghabad ) from bararee 6-pit ( total length of delivery range approx-3 km) total section of pipeline to be repaired 300 mtr 6 inch dia m.s. pipe and 36 mtrs of 8 inch m.
Repairing of pipeline used for supply of domestic water supply to nbcc colony(parghabad ) from bararee 6-pit ( total length of delivery range approx-3 km) total section of pipeline to be repaired 300 mtr 6 inch dia m.s. pipe and 36 mtrs of 8 inch m.
Read moreRepairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area
Repairing of the four nos. of base plates of the four nos. of 2000 gpm and 1000 gpm pump motor sets, and repair of the 8 inch dia suction pipeline of the two nos. of 2000 gpm pumps, installed in mine, w.r.t. karo ocp, under bnk area
Read moreInstallation of 03 nos. of diesel engine 1000 gpm pump in different places of mines arrangement of connection with pipelines of 6 inch dia and 4 inch dia pipeline (300 mtr. each approx.) for supply water in ob dump miyawaki tree plantation
Installation of 03 nos. of diesel engine 1000 gpm pump in different places of mines arrangement of connection with pipelines of 6 inch dia and 4 inch dia pipeline (300 mtr. each approx.) for supply water in ob dump miyawaki tree plantation
Read moreTransportation within the mines periphery laying and installation of 8 inch dia ms pipeline of 03 three nos 200 mtr each for dewatering mines and 4 inch pipeline for tanker point at tetariakhar ocp under rajhara area
Transportation within the mines periphery laying and installation of 8 inch dia ms pipeline of 03 three nos 200 mtr each for dewatering mines and 4 inch pipeline for tanker point at tetariakhar ocp under rajhara area
Read moreProvision and plantation (in 30 days) of 400 nos. of saplings with tree guards and maintaining the plants for one years at different places in mines at tsocp of hazaribagh area
Provision and plantation (in 30 days) of 400 nos. of saplings with tree guards and maintaining the plants for one years at different places in mines at tsocp of hazaribagh area
Read moreDismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Dismantling, shifting and installation of 01 nos. 1000 gpm pump and 02 nos. 2000 gpm pump for 03 months with base frame, suction pipeline, delivery pipeline, valves etc. at shifted location for pump shifting in the mines as per requirement of peo
Read moreLaying of 4 inch dia pipeline including day to day reorganization/ handling on different terrain from siltation tank to ob fire zone beside gwala patti including connection and laying of 2.5 inch dia pipe with fire hose and nozzle to disperse water
Laying of 4 inch dia pipeline including day to day reorganization/ handling on different terrain from siltation tank to ob fire zone beside gwala patti including connection and laying of 2.5 inch dia pipe with fire hose and nozzle to disperse water
Read moreLaying of 4 inch dia pipeline including day to day reorganization/ handling on different terrain from siltation tank to ob fire zone beside gwala patti including connection and laying of 2.5 inch dia pipe with fire hose and nozzle to disperse water o
Laying of 4 inch dia pipeline including day to day reorganization/ handling on different terrain from siltation tank to ob fire zone beside gwala patti including connection and laying of 2.5 inch dia pipe with fire hose and nozzle to disperse water o
Read moreof your Industry type