Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Electrification Work Of 6 Percent Abadi Plots In Village Luksar Phase 2, Greater Noida.
|
Description |
Electrification Work Of 6 Percent Abadi Plots In Village Luksar Phase 2, Greater Noida.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_GNIDA_840050_1 |
Reference Number |
SM/(E-TENDER CELL)/2023/475 DATE-13.09.2023 |
Tender Fee | 1820 |
EMD | 1.28 Lakh |
Tender Value | |
Place | GREATER NOIDA INDUSTRIAL DEVELOPMENT AUTHORITY |
Link | https://etender.up.nic.in |
Start Date | September 19, 2023 22:30 |
End Date |
06/10/2023 ( Expired 639 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Implementation and maintenance of centralized erp system in aweil hq and its units as per scope of work
Read moreLicensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Licensing of co-branding and inside advertising rights of four (4) no. underground metro stations (medical 
 college-r.b.s college) of agra metro rail corridor-1 in upmrc network as per scope of work mentioned in tender document
Read moreConsultancy services for authority engineer for supervision of widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Widening to 2-lane from existing chainage km. 74.700 to km. 100.660 design chainage km 53.365 to km 78.785 on nh-507 in the state of uttarakhand.
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreConsultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Consultancy services for preparation of dpr for the work construction of 4 lane bypass to mahabubnagar town from km 275.350 of nh 167 to km 13.285 of nh 167n in the state of telangana
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreUpgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Upgradation of existing intermediate lane flexible pavement to 2 lane with paved shoulders flexible pavement from km 0.000 (orchha) to km 75.000 (length 75.000 km) on orchha tikamgarh shahgarh nh-539 in the state of madhya pradesh on epc mode
Read moreLicensing of semi-naming rights
Licensing of semi-naming rights of seen (17) no. metro stations of lucknow metro rail project in upmrc
 network as per scope of work mentioned in tender
Read moreWork of one time treatment of bypassed portion of dharuhera town on nh 919, ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Work of one time treatment of bypassed portion of dharuhera town on nh 919,
 ch km 17.700 to 19.700 and ch. 20.000 to ch. 22.530 falling in haryana state.
Read moreof your Industry type