Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Budget Work 2023 Improvements To Kettezhathukadavu Road Ch 0/000 To 1/600 Thripunithura Constituency General Civil Work
|
| Description |
Scarifying The Existing Bituminous Road Surface, Providing, Laying, Spreading And Compacting Graded Stone Aggregate To Wmm, Providing And Applying Primer Coat With Bitumen Emulsion ( Ss), Providing And Applying Tack Coat With Bitumen Emulsion( Rs), P
|
| Organisation | Government of Kerala |
| Tender Id | 2023_PWD_584890_1 |
|
Reference Number |
PWD/RB/TR/7297/2023_5_1_1/1 |
| Tender Fee | 2760 |
| EMD | 50000 |
| Tender Value | - |
| Place | KAKKANAD |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | June 30, 2023 23:30 |
| End Date |
Expired
11/07/2023
Expired 1189 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvements to pwd randb road to ramalayam (kosgi town) from km 0/0 to 0/600 in kodangal assembly consituency in narayanpet district(2nd call)
Improvements to pwd randb road to ramalayam (kosgi town) from km 0/0 to 0/600 in kodangal assembly consituency in narayanpet district(2nd call)
Read moreImprovements to doultabad pwd road to agmapur road via sikindlapur and naguladevlapally road from km 0/800 to 1/600 in sangareddy district
Improvements to doultabad pwd road to agmapur road via sikindlapur and naguladevlapally road from km 0/800 to 1/600 in sangareddy district
Read moreAm to the roads a shamshabad to shabad from km 17/00 to 33/400 b amdhapur branch road km 0/0 to 9/600 c chevella to kothapally road from km 0/0 to 6/800 d himayathnagar-tangedpally road from km 10/750 to 32/0 under chevella section in ranga reddy district for the year 2026-27 2nd call
Am to the roads a shamshabad to shabad from km 17/00 to 33/400 b amdhapur branch road km 0/0 to 9/600 c chevella to kothapally road from km 0/0 to 6/800 d himayathnagar-tangedpally road from km 10/750 to 32/0 under chevella section in ranga reddy district for the year 2026-27 2nd call
Read moreImprovements to basanalagadde hirekudi ngaral nej (mdr) road from km no 3.00 to 6.25 (selected reaches) (hirekudi school to nagaral) (proposed from ch 3.30km to 4.24km) in chikodi taluka of belagavi dist under hoa 5054-app e mdr road itare bandaval vechha for the year 2026-27
Improvements to basanalagadde hirekudi ngaral nej (mdr) road from km no 3.00 to 6.25 (selected reaches) (hirekudi school to nagaral) (proposed from ch 3.30km to 4.24km) in chikodi taluka of belagavi dist under hoa 5054-app e mdr road itare bandaval vechha for the year 2026-27
Read moreGeneral-budget work 2024-25 (20percent)-upgradation ,improvements to chengaloor -mannampetta - mavinchuvadu road ch. 0/000 to 3/250km in pudukkad constituency-improvements to chengaloor -mannampetta - mavinchuvadu road ch. 0/000 to 3/250km in pudukka
Earth work excavation, pcc , pcc m 15,rcc m 20, precast cover slabs ,hysd bar reinforcement , dr masonry, granular sub base and wet mix are proposed&#x0d for widening the road, bm and bc, with shredded plastic filling pot holes,tile,traffic safety
Read moreBudget-2024-25 (20) improvements to kanakakkunnu puthenkuriz chandhanakkavala road between ch.0/000 to ch.2/200
Budget-2024-25 (20) improvements to kanakakkunnu puthenkuriz chandhanakkavala road between ch.0/000 to ch.2/200
Read moreGeneral-budget work 2018-19-- improvements to choondy -ramamangalam road ch 0/000to 5/800 and meempara - thiruvaniyoor road ch 0/000 to 4/000 phase 2- improvements to choondy - ramamangalam road ch 0/000 to 5/800- general civil work
Road work,road safety work,drainage work
Read moreGeneral-budget-2024-25-(20) improvements to pullukandam quarry road between ch.0/000 to ch.0/500-work-general civil work
General-budget-2024-25-(20) improvements to pullukandam quarry road between ch.0/000 to ch.0/500-work-general civil work
Read moreRetender -general budget work 2019-20 improvements and bc resurfacing to uc college edayar road ch 0/000 to 5/600 work-balance work
Ewe, concrete works,drain and shoulder strengthening works,prime coat,tack coat,bm bc,culvert,retaining&#x0d wall,traffic safety works
Read moreof your Industry type