Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Elevator,Installation,Amc For 1st Year Beyond Warranty Period,Amc For 2nd Year Beyond 1st Year Amc,
|
| Description |
|
| Organisation | NORTH EASTERN ELECTRIC POWER Corporation Limited | Ministry of Power |
| Tender Id | GEM/2025/B/5830126 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 17, 2025 16:40 |
| End Date |
Expired
31/01/2025
Expired 621 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Blood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Blood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Read moreSupply of blue star make vegetable cold room of 4-degree centigrade room temperature,transportation loading unloading and incidental cost till consignee s site,installation testing commissioning,cmc after warranty period for 1 year,cmc after warranty period for 2 year,cmc after warranty period for 3 year,cmc after warranty period for 4 year,cmc after warranty period for 5 year
Supply of blue star make vegetable cold room of 4-degree centigrade room temperature,transportation loading unloading and incidental cost till consignee s site,installation testing commissioning,cmc after warranty period for 1 year,cmc after warranty period for 2 year,cmc after warranty period for 3 year,cmc after warranty period for 4 year,cmc after warranty period for 5 year
Read moreAmc for maintenance of tk elevator in chemical plant of ucil, tummalapalle
Amc for maintenance of tk elevator in chemical plant of ucil, tummalapalle
Read more90.99.23.426.5 deep freezer,90.00.01.496.8 explosion proof refrigerator,90.00.01.495.8 refrigerated centrifuge,90.00.01.497.8 heating-cooling chiller,9002160 amc for 1st year,9002160 amc for 2nd year,9002160 amc for 3rd year
90.99.23.426.5 deep freezer,90.00.01.496.8 explosion proof refrigerator,90.00.01.495.8 refrigerated centrifuge,90.00.01.497.8 heating-cooling chiller,9002160 amc for 1st year,9002160 amc for 2nd year,9002160 amc for 3rd year
Read moreElectrical and mechanical components for lis phase 1st stage 2nd khudpora
Electrical and mechanical components for lis phase 1st stage 2nd khudpora
Read moreCooler insert 1st stage (ee9935v-067738),cooler insert 2nd stage (ee9935v-067715)
Cooler insert 1st stage (ee9935v-067738),cooler insert 2nd stage (ee9935v-067715)
Read moreIsi marked xlpe insulated ltug 4c x 16 sq. mm cable with 30 months warranty period
Isi marked xlpe insulated ltug 4c x 16 sq. mm cable with 30 months warranty period
Read moreRepair and maintenance work at various 1st and 2nd type gad banglows, jodhpur
Repair and maintenance work at various 1st and 2nd type gad banglows, jodhpur
Read moreComprehensive revamp of main foyer on 1st and 2nd floor at admin building
Comprehensive revamp of main foyer on 1st and 2nd floor at admin building
Read moreOperation and maintenance of effluent/sewage treatment plant - complete system 1 functional but outside amc and warranty
Operation and maintenance of effluent/sewage treatment plant - complete system 1 functional but outside amc and warranty
Read moreof your Industry type