Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Hiring Of Jcb Machine And Hydraulic Tractor Trolley For Lifting Of Cand D Waste In Ballabgarh Division.
|
Description |
Hiring Of Jcb Machine And Hydraulic Tractor Trolley For Lifting Of Cand D Waste In Ballabgarh Division.
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_424906_1 |
Reference Number |
202505122DA6 75BB 4255 A6FE 1793B7B8275B284ULB |
Tender Fee | 1480 |
EMD | 18800 |
Tender Value | |
Place | Faridabad (MC) |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=501716 |
Start Date | January 21, 2025 14:30 |
End Date |
27/01/2025 ( Expired 145 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying and stacking of 65 mm machine crushed ballast at karjat depot under aden (n) lnl.
For complete deion and other details, please refer to tender
Read moreSupply of hydraulic insulator testing jig for tensile load testing of 25kv porcelain and composite insulator as per rdso spec. no. ti/spc/ohe/instest/0090/(02/2009) rev o or latest.
For complete deion and other details, please refer to tender
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read morePspcl aerocity mohali invites online tender in three bid system from eligible and qualified original equipment manufacturers authorized distributors of oem authorized dealers of oem for the supply of furniture at site
Pspcl aerocity mohali invites online tender in three bid system from eligible and qualified original equipment manufacturers authorized distributors of oem authorized dealers of oem for the supply of of furniture at site
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreProvn of additional toilet block and allied works for living in billets at af stn vadodara
Provn of additional toilet block and allied works for living in billets at af stn vadodara
Read moreof your Industry type