Tender Details
Particulars | Details |
---|---|
Title |
In Gorakhpur, The Work Of Shifting The Underground Drinking Water Pipeline Coming Under Protection For The Construction Of 02 Lane Overpass At Crossing Number 162 A Between Domingarh And Gorakhpur Junction Rallway Stations Of Lucknow Gorakhpur Railway
|
Description |
In Gorakhpur, The Work Of Shifting The Underground Drinking Water Pipeline Coming Under Protection For The Construction Of 02 Lane Overpass At Crossing Number 162 A Between Domingarh And Gorakhpur Junction Rallway Stations Of Lucknow Gorakhpur Railway
|
Organisation | Directorate of Local Bos UP | State Govt. and UT |
Tender Id | 2025_DOLBU_992899_1 |
Reference Number |
Shifting pipe line |
Tender Fee | 5900 |
EMD | 1.01 Lakh |
Tender Value | |
Place | gorakhpur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1809254 |
Start Date | February 21, 2025 14:30 |
End Date |
07/03/2025 ( Expired 46 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross
Read moreThe work of shifting the drinking water pipeline coming in the alignment of building construction near the kachhari club at town hall square
The work of shifting the drinking water pipeline coming in the alignment of building construction near the kachhari club at town hall square
Read moreIn gorakhpur, the work of shifting the underground drinking water pipeline coming under protection for the construction of 02 lane overpass at crossing number 162a between domingarh and gorakhpur junction rallway stations of lucknow gorakhpur railway
In gorakhpur, the work of shifting the underground drinking water pipeline coming under protection for the construction of 02 lane overpass at crossing number 162a between domingarh and gorakhpur junction rallway stations of lucknow gorakhpur railway
Read moreDoubling of railway track between trivandrum and kanyakumari replacing and relocation of kwa water pipe lines in karamana sastri nagar
Doubling of railway track between trivandrum and kanyakumari replacing and relocation of kwa water pipe lines in karamana sastri nagar as part of approach road formation under karamana water works section pipeline work
Read moreRemaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)
Remaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)
Read moreConstruction of 2 lane rob on jakhal hisar railway line on level crossing c-6 at km. 12/01-02 near jamalpur sheikhan on tohana kullan road in fatehabad district. (pdg. shifting of ht/lt line only)
Construction of 2 lane rob on jakhal hisar railway line on level crossing c-6 at km. 12/01-02 near jamalpur sheikhan on tohana kullan road in fatehabad district. (pdg. shifting of ht/lt line only)
Read moreBalance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Balance work of construction of proposed 4 lane rob and its approaches in lieu of existing level crossing no.124e/spl3 at km 1.800 on nh 205 between prasannayapalle n zangalapalle railway stations on anantapur dharmavaram railway section in the stat
Read moreRemaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)
Remaining and balance work of construction of two (02) lane rob in lieu of lc no. 44 (gulab bari fatak) at rly. km. 291/3-4 between madar ajmer stations (excluding cost of cement)
Read moreConstruction of 1 x 60 mtr span intermediate lane arch type motorable bridge over river suru at balti bazar junction incld. design, supply, fabrication and lunching /decking of superstructure, abutments , approach road ,protection work etc.
Construction of 1 x 60 mtr span intermediate lane arch type motorable bridge over river suru at balti bazar junction incld. design, supply, fabrication and lunching /decking of superstructure, abutments , approach road ,protection work etc.&#x0d (under
Read moreUtility shifting (shifting of electrical lines) for the work construction of r.o.b. in replacement of railway level crossing gate no. fm-72 at cinnamora on jorhat mariani mokochung road in the district of jorhat, assam under construction of robs on
Utility shifting (shifting of electrical lines) for the work construction of r.o.b. in replacement of railway level crossing gate no. fm-72 at cinnamora on jorhat mariani mokochung road in the district of jorhat, assam under construction of robs on
Read moreof your Industry type