Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ng Hard Wood Sleeper 5' X 6'' X 5''
|
| Description |
|
| Organisation | COAL INDIA LIMITED | Ministry of Coal |
| Tender Id | GEM/2024/B/5063324 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 18, 2024 21:49 |
| End Date |
Expired
09/07/2024
Expired 824 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
M/S KHAN TIMBER AND FURNITURE MART
1402500
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | KAMESWAR SAW MILL | Make : KSM Model : WOOD Title : WOOD | 23-06-2024 14:19:54 | Registered with designated Agency / Authority | MII N/A | Disqualified |
| 2 | M K Timber | Make : NA Model : Unbranded Title : NG HARDWOOD SLEEPER | 09-07-2024 15:25:30 | Registered with designated Agency / Authority | MII N/A | Qualified |
| 3 | M/S KHAN TIMBER AND FURNITURE MART | Make : khan timber Model : WOODEN SLEEPER Title : wooden sleeper | 09-07-2024 16:52:17 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 4 | M/s. TULSHIDAS G. SHETH | Make : HARDWOOD SLEEPER Model : HARDWOOD SLEEPER Title : HARDWOOD SLEEPER | 09-07-2024 13:22:50 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 5 | MOAZZAM CONSTRUCTION | Make : moazzam construction Model : WOODEN SLEEPER Title : WOODEN SLEEPER | 09-07-2024 16:12:51 | Registered with designated Agency / Authority | MII MSE | Qualified |
| 6 | NIKHIL KUSHWAHA | Make : UNBRAND Model : WOODEN SLEEPER Title : WOODEN SLEEPER | 09-07-2024 16:22:46 | Central / State PSUs | MII N/A | Disqualified |
| 7 | QUALITY TIMBER AND FURNITURE MART | Make : QUALITY TIMBER AND FURNITURE MART Model : NG HARDWOOD SLEEPER 5'(FEET) X 6" (INCH) X 5" (INC Title : HARDWOOD SLEEPER | 09-07-2024 16:48:23 | Central / State PSUs | MII N/A | Disqualified |
| 8 | Variety Timber Mart | Make : wood Model : wood Title : wood | 03-07-2024 18:42:15 | Registered with designated Agency / Authority | MII N/A | Qualified |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| wooden sleeper | khan timber | WOODEN SLEEPER | 2500 | ₹ 1402500.000 |
Providing and fixing of false ceiling, ply wood partitions, aluminium partitions, scientific doors at golden jublie building and bajaj best center, jntuh, kukatpally, hyderabad.
Providing and fixing of false ceiling, ply wood partitions, aluminium partitions, scientific doors at golden jublie building and bajaj best center, jntuh, kukatpally, hyderabad.
Read moreDevelopment of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Development of madhapur graveyard in harijana basti by providing of burning unit, pooja mandap, dimpudu kallam, kerb walls, seating galleries, lord siva statue, ash storage room, wood storage room, toilet blocks, rain water harvesting pit etc, in ward no.232, madhapur circle-50, kukatpally zone
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type