Tender Details
Particulars | Details |
---|---|
Title |
Repair Of 75 Kva,208 Volt 3 Phase 400 Hz Static Freequency Converter
|
Description |
Repair Of 75 Kva,208 Volt 3 Phase 400 Hz Static Freequency Converter
|
Organisation | Indian Air Force | Central Govt. Ministry/Department |
Tender Id | 2024_IAF_680574_1 |
Reference Number |
40W/3576/750/R-403/23-24/LGS |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | AIR FORCE STN GWALIOR,(M.P) 474020 |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=761364 |
Start Date | October 22, 2024 14:30 |
End Date |
29/10/2024 ( Expired 198 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreConstruction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Construction of hl bridges at ch.195/2, ch.198/2, ch.198/3, ch. 199/4, ch. 208/1, ch.208/4, ch.210/1, ch.211/1 on nh-143 (old nh-23)in the state of jharkhand.
Read moreRepair and replacement of submain wiring mcb mccbs dbs fixtures and fitting and connected works at md accn of scientist hostel and d type qts at phase i under ge i r and west bangalore
Repair and replacement of submain wiring mcb mccbs dbs fixtures and fitting and connected works at md accn of scientist hostel and d type qts at phase i under ge i r and west bangalore
Read moreRope light 50 mtr,welding machine 3 phase,wall fan 400 mm,welding machine goggle,fattener nut bolt
Read more
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreSweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Sweeping of roads in urban estate sector 32-a, 33, 39-a and sector-40, samrala road, ludhiana and urban estate phase-3 and 200 feet wide road dugri road, ludhiana (from 01.04.2025 to 31.03.2026)
Read moreSpecial repair to dg set control panel and replacement of ber cooling appliance phase-ii at hq sac (u) under ge(af) trivandrum
Special repair to dg set control panel and replacement of ber cooling appliance phase-ii at hq sac (u) under ge(af) trivandrum.
Read moreSpecial repair of various rural link roads falling in mc sardulgarh (earth work to premix work incld. const. of culverts, drain etc) distt. mansa group no 3(25-064)
Special repair of various rural link roads falling in mc sardulgarh (earth work to premix work incld. const. of culverts, drain etc) distt. mansa group no 3(25-064)
Read moreof your Industry type