Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Spray Painting/ Painting Of Turbine, Condenser, Heat Exchanger Pipeline, Pumps And Etc. During Overhauling Of Unit No.12, Btps,Obra
|
Description |
Spray Painting/ Painting Of Turbine, Condenser, Heat Exchanger Pipeline, Pumps Nd Etc. During Overhauling Of Unit No.12, Btps,Obra
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_RVUNL_820488_1 |
Reference Number |
OBR/OMC2/TMD2/6000002713/23-24 |
Tender Fee | 580 |
EMD | 7100 |
Tender Value | |
Place | SE-OMC-IIx200MW,BTPS,Obra |
Link | https://etender.up.nic.in |
Start Date | July 15, 2023 14:30 |
End Date |
16/08/2023 ( Expired 692 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d
Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d
Read moreOverhauling of fans
Overhauling of id,fd,pa fans and its auxiliary etc. during overhauling of unit no. 3 of 3x210 mw atps anpara.
Read moreRepairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Read moreOverhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.
Overhauling of 3 (three) nos of cw pump motors and 2 (two) nos of acw pump motors during unit#3 overhauling (2026) under emoph department.
Read moreOver hauling of esp transformers and associated equipments at esp top of unit no. 13, btps, obra.
Over hauling of esp transformers and associated equipments&#x0d at esp top of unit no. 13, btps, obra.
Read moreOverhauling of 0.4kv lt motors of unit no. 13th and common plant auxiliaries of btps obra
Overhauling of 0.4kv lt motors of unit no. 13th and common&#x0d plant auxiliaries of btps obra
Read moreOverhauling of esp controllers, switchgear, rapping motor, rapping mechanism and heater system control of unit no.13 btps obra.
Overhauling of esp controllers, switchgear, rapping motor,&#x0d rapping mechanism and heater system control of unit no.13&#x0d btps obra.
Read moreDeployment of radiography team with remote operated gamma radiography camera and taking radiography shots, processing of the films and interpretation of h.p. joints of pressure parts during overhauling of unit-03 of 3x210 m.w., a tps, anpara
Deployment of radiography team with remote operated gamma radiography camera and taking radiography shots, processing of the films and interpretation of h.p. joints of pressure parts during overhauling of unit-03 of 3x210 m.w., a tps, anpara
Read moreOverhauling of cw pumps, butterfly valves, submerged structure of tws, servicing of gearbox of tws, repairing of damaged basket frames, repairing/knitting/tightening of mesh wire in basket frame etc. at cw pump house during o/h-13
Overhauling of cw pumps, butterfly valves, submerged structure of tws, servicing of gearbox of tws, repairing of damaged basket frames, repairing/knitting/tightening of mesh wire in basket frame etc. at cw pump house during o/h-13
Read moreRepair and renovation of office building of pwd (r and b) rupaichari sub division during the year 2025-26/ sh - dismantling/ demolishing, patch plastering, painting, tile works, aluminium works, water supply and sanitary installation etc.
Repair and renovation of office building of pwd (r and b) rupaichari sub division during the year 2025-26/ sh - dismantling/ demolishing, patch plastering, painting, tile works, aluminium works, water supply and sanitary installation etc.
Read moreof your Industry type