Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Spares For Afc Belt And Motor Pulley Of Ohcu
|
| Description |
Spares For Afc Belt And Motor Pulley Of Ohcu
|
| Organisation | IndianOil Corporation Limited(IOCL) |
| Tender Id | 2023_HR_173999_1 |
|
Reference Number |
RHM23R1076 |
| Tender Fee | - |
| EMD | 0 |
| Tender Value | - |
| Place | HALDIA REFINERY |
| Link |
View Original Tender Notice
https://iocletenders.nic.in |
| Start Date | December 19, 2023 23:45 |
| End Date |
Expired
02/01/2024
Expired 1013 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of bfp main pump model fk6d30 spares & booster pump model fa1b56 spares
Procurement of bfp main pump model fk6d30 spares & booster pump model fa1b56 spares
Read moreProcurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belt for reversible belt feeder conveyor working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreSpares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Spares suitable for siemens make 420 kv,2000amps,tp 415v motor operated centre break isolator with single earth switch type 400 kv hcb installed at 400 kv switchyard
Read moreSupply of spares for boiler hea ignition system
Supply of spares for boiler hea ignition system
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreof your Industry type