Tender Details

Particulars Details
Title
Rectification Of Alignment Of Peb Footings Of Inspection Shop Extension Shed By Jack Mechanism, Midhani
Description
Rectification Of Alignment Of Peb Footings Of Inspection Shop Extension Shed By Jack Mechanism, Midhani
Organisation MIDHANI | Public Sector Undertakings
Tender Id 2025_MDN_97287_1
Reference
Number
AP20251005/ELT/015/25-26
Tender Fee 0
EMD 0
Tender Value -
Place MIDHANI, HYDERABAD
Link
View Original Tender Notice

eprocuremidhanigsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=106799

Start Date April 30, 2025 23:30
End Date
Expired 22/05/2025

Expired 510 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any

Read more
Civil works involved in extension of peb shed for inspection shop and construction of ndt and machine shop office buildings midhani

Civil works involved in extension of peb shed for inspection shop and construction of ndt and machine shop office buildings midhani

Read more
Epc for supply, fabrication and erection of industrial shed for extension of inspection shop shed and ndt and machine shop office buildings through peb system at midhani

Epc for supply, fabrication and erection of industrial shed for extension of inspection shop shed and ndt and machine shop office buildings through peb system at midhani

Read more
Construction of drains adjoining extended portion of inspection shop and office building in between machine shop and kapp shop

Construction of drains adjoining extended portion of inspection shop and office building in between machine shop and kapp shop

Read more
Civil works involved in extension and renovation of forge shop wash rooms

Civil works involved in extension and renovation of forge shop wash rooms

Read more
Fabrication, erection and commissioning of utility services for new inspection shed near machine shop

Fabrication, erection and commissioning of utility services for new inspection shed near machine shop

Read more
Civil works for construction of foundation for 4 guide way heavy duty lathe machine at inspection shop

Civil works for construction of foundation for 4 guide way heavy duty lathe machine at inspection shop

Read more
Echp-i- overhauling and inspection of jack shaft bearings and replacement if necessary and checking the alignment of jack shaft drive and driven pulley in crusher-a at secondary crusher house-i.

Echp-i- overhauling and inspection of jack shaft bearings and replacement if necessary and checking the alignment of jack shaft drive and driven pulley in crusher-a at secondary crusher house-i.

Read more
Repairing of hydraulic jack rear both side, alignment/repairing of boom extension ,pulley and locking arrangement of til crane 40 t of purnadih project

Repairing of hydraulic jack rear both side, alignment/repairing of boom extension ,pulley and locking arrangement of til crane 40 t of purnadih project

Read more
Ahp dn rectification of defects in 6 ton capacity 2 nos for unit i ii iii eot crane in ash handling slurry pump house by overhauling of long travels mechanism cross travels mechanism main hoists mechanism gear boxes inspection of control panels

Ahp dn rectification of defects in 6 ton capacity 2 nos for unit i ii iii eot crane in ash handling slurry pump house by overhauling of long travels mechanism cross travels mechanism main hoists mechanism gear boxes inspection of control panels

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise