Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Foundation Platform Of 02 Nos. Distribution Transformer And Primary Controlling Of Vcb Switches And Shifting Of Transformers And Vcb On Platform At Main Sub Station Of Gvp Phase Ii Ocp, Kathara Area
|
Description |
Construction Of Foundation Platform Of 02 Nos. Distribution Transformer And Primary Controlling Of Vcb Switches And Shifting Of Transformers And Vcb On Platform At Main Sub Station Of Gvp Phase Ii Ocp, Kathara Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | Office of the Project Engineer (E and M), GVP Ph-I |
Link |
AAAAAAAAAA Login to view |
Start Date | July 04, 2025 15:30 |
End Date |
15/07/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Read moreDesign and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreConstruction of shed for storage of substation t&ps and ers material lying on the platform in ers store at 765/400/220 kv gaya sub-station
Construction of shed for storage ofsubstation tand ps and ers material lying on the platform iners store at gaya sub-station
Read moreConstruction of foundation platform of 02 nos. distribution transformer and primary controlling of vcb switches and shifting of transformers and vcb on platform at main sub-station of gvp phase-ii ocp, kathara area
Construction of foundation platform of 02 nos. distribution transformer and primary controlling of vcb switches and shifting of transformers and vcb on platform at main sub-station of gvp phase-ii ocp, kathara area
Read moreCalibration of existing ets model no. zt20r-2, make- geomax and purchase of 03 nos. of complete prism for survey section, govindpur phase-ii, ocp, kathara area.
Calibration of existing ets model no. zt20r-2, make- geomax and purchase of 03 nos. of complete prism for survey section, govindpur phase-ii, ocp, kathara area.
Read moreConstruction of foundation sub structure super structure main approach road and protection work at gomti river bridge golaghat on utraula ayodhya sultanpur prayagraj sh09 marg in distt sultanpur on sbd mode
Construction of foundation sub structure super structure main approach road and protection work at gomti river bridge golaghat on utraula ayodhya sultanpur prayagraj sh09 marg in distt sultanpur on sbd mode
Read moreEngineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Engineering, supply, erection, commissioning and testing of scada-dms automation package for two (02) nos. central control centre and 24 nos. sub-stations towards supervision and control of 11 kv network in dvc command area on turnkey basis
Read moreConstruction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Construction of 20 (twenty) nos. new ventilation stopping and 02 nos. ventilation double door between intake and airways p-9c and p-7a proposed depillaring panel in lk-ii seam of jamuna 9/10 mine, bhadra sub area, jamuna kotma area.
Read moreConstruction commissioning of 02 nos single phase tubewells size 150 mm dia with submersible pump sets cabel and riser pipe including pvc tank of 2000 litres capacity with ms platform etc complete work in subdivision pratapgarh district pratapgarh
Construction commissioning of 02 nos single phase tubewells size 150 mm dia with submersible pump sets cabel and riser pipe including pvc tank of 2000 litres capacity with ms platform etc complete work in subdivision pratapgarh district pratapgarh
Read moreConstruction of 02 nos 33 kv dlf feeder bay and related civil works at 132 kv sub station mohnlalganj lucknow
Construction of 02 nos 33 kv dlf feeder bay and related civil works at 132 kv sub station mohnlalganj lucknow
Read moreof your Industry type