Tender Details
About Tender
🏗️ Construction Opportunity: Retaining Wall Project 🌳 The Ministry Of Railways, Central Government, Invites Tenders For The Construction Of A Retaining Wall At B.R. No. 788/1 Km, From 788/300 To 789/700, In Connection With The Left Over Works Of The Newly Commissioned 3rd Line Between Chitoda Hinghanghat And Wardha Chitoda 2nd Chord Line Under Aden Warora. 📅 Bid Submission Deadline: July 01, 2024, 3:00 Pm Emd: Inr 2,23,300 Interested Contractors Must Review The Complete Tender Documents For Detailed Specifications, Project Scope, And Submission Guidelines. This Project Is A Part Of The Indian Railways' Ongoing Infrastructure Development. Keywords: Construction, Retaining Wall, Ministry Of Railways, Infrastructure Development, Tender, Aden Warora, Mumbai Cst, Government ContractParticulars | Details |
---|---|
Title |
Construction Of Retaining Wall At Br.No.788/1km 788/300 789/700 In Connection With Left Over Works Of Newly Commissioned 3rd Line Between Chitoda Hinghanghat And Wardha Chitoda 2nd Chord Line Under Aden Warora.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 75320370 |
Reference Number |
DRMWNGP-52-2024-01 |
Tender Fee | 0 |
EMD | 2.23 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75320370/viewNitPdf_4583653.pdf |
Start Date | June 07, 2024 23:30 |
End Date |
01/07/2024 ( Expired 296 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rcc cast in situ central drain(approx 1km) & side drain of up & dn & dn & 3rd line between mngd-thv at km:292/08-20, 293/05-294/1, 294/1-295/25, 296/24-42, 298/01-18, 298/28-299/15, 300/12-24, 300/ 34-09 , 303/ 01-304 /08 (between mngd-bmck), 305/07-306/28, 306/28-307/1, 308/2-323/12 (between bmck-thv) under the jurisdiction of aden/muniguda of sambalpur division.
For complete deion and other details, please refer to tender
Read more(1) tbr 18.246 km under sr. den/east/nagpur (2)left over p.way works between pjb-btl from km 935.533 (excl. yards) to km 944.438 (excl. yards) in 3rd line section in the jurisdiction of aden/dongargarh. (3) p.way works for maintenance of 3rd line between gdm-dnl km 970.10 to km 990.360 under the jurisdiction of aden/gondia.
For complete deion and other details, please refer to tender
Read more(i)balance work in up m/l (newly constructed) between bdc-mug including bdc-mug station yard and bdc-nh branch line with other ancillary work under aden/bdc & (ii) balance work in connection with handing over & taking over of 3rd line between mug-khn from km. 45/9-11 to km 54/9-11 (8.94 km) [p.way portion]
For complete deion and other details, please refer to tender
Read moreAugmentation/addition & modification/alteration in kyosan make ei conforming to rdso specification no. rdso/spn/192/2019 or latest (with latest amendment if any) as per approved sip and along with balance outdoor work including provsion of automatic fire suppresion with part supply of left over materials at gonda jn in connection to 3rd line between gonda jn and gonda kutchehry in lucknow division of n.e.railway.
For complete deion and other details, please refer to tender
Read moreTwo misc work under sr.den/west/jbp jurisdiction. part i:- provision of circulating area and high level platform no.1 in lidhora station under aden/sgo sub-division (left over work by construction). part ii:- extension of high level platform no.01 at kte-end by 100 meter along with provision of passenger amenities at damoh station in connection with bina-kte 3rd line.
For complete deion and other details, please refer to tender
Read moreExecution of miscellaneous work like foot over bridge, extension of foot over bridge, pf, ext. pf, minor bridge, retaining wall, toe protection, height gauge, road work, rubberized lc surfacing and other allied works between narayangarh-baleshwar in connection with the construction of 3rd line between narayangarh-bhadrak for s. e. railway. estimate no. 1792w/2019.
For complete deion and other details, please refer to tender
Read moreProposed left over works of newly commissioned 3rd line between chitoda - hinganghat section and wardha - chitoda / 2nd chord line under aden -warora sub division (track portion drain work)
For complete deion and other details, please refer to tender
Read moreConstruction of retaining wall at br.no.788/1km 788/300-789/700 in connection with left over works of newly commissioned 3rd line between chitoda - hinghanghat and wardha - chitoda 2nd chord line under aden warora.
For complete deion and other details, please refer to tender
Read moreBalance work for construction of rcc drain, curtain wall, toe wall at bridge, flooring, pitching and other miscellaneous left over work in connection with 3rd line between apr-kte under the jurisdiction of assistant divisional engineer/umaria of bilaspur division.
For complete deion and other details, please refer to tender
Read moreBalance work for earth work in cutting, cess repair/improvement, dismantling of station building i.e. chdx , construction of rcc drain and other miscellaneous left over work in connection with 3rd line between apr-kte under the jurisdiction of assistant divisional engineer/shahdol of bilaspur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type