Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Eicher Ba No 20 D 210310 X Left Side Window Glass To Be Fitted,Eicher Mini Bus Ba No 15 P 029902 H Left
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | July 01, 2025 17:00 |
End Date |
21/07/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tata large bus (ba no 15p 029962n) changing fan belt and cleaning radiator,tata large bus (ba no 17
Read more
Eicher ba no 20d 210310x left side window glass to be fitted,eicher mini bus ba no 15p 029902h left
Read more
Spl repair to roof at verandah and front side window of bldg no o-7 (rampart 1 to 11) inside fort william under ge (fw) kolkata
Spl repair to roof at verandah and front side window of bldg no o-7 (rampart 1 to 11) inside fort william under ge (fw) kolkata
Read moreConstruction of side strip road and drain from ulhasnagar 1 jb farsan to bus stop no. 1.
Construction of side strip road and drain from ulhasnagar 1 jb farsan to bus stop no. 1.
Read moreConstruction of side strip and drain from ulhasnagar 1 jai kamal hotel to bus stop no. 1
Construction of side strip and drain from ulhasnagar 1 jai kamal hotel to bus stop no. 1
Read moreRepair to eicher 10.75 veh ba no 17d 203400y of age em 1 under ge central khadki
Repair to eicher 10.75 veh ba no 17d 203400y of age em 1 under ge central khadki
Read moreRoad construction work through side track construction and hotmix on ward-46 mini bypass road from bhasin traders to the main gate of ramlila ground via hartman kazel gate no. 02.
Road construction work through side track construction and hotmix on ward-46 mini bypass road from bhasin traders to the main gate of ramlila ground via hartman kazel gate no. 02.
Read moreConstruction of rcc strom water drain left side from ward 11 chungi to balbir sharma shop near drain no 1 ward no 11 mc panipat urban for l and c society
Construction of rcc strom water drain left side from ward 11 chungi to balbir sharma shop near drain no 1 ward no 11 mc panipat urban for l and c society
Read moreZone-1 chhata room no. 50 interlocking work on drain and side track on left side of road from chamunda devi temple behind madhushree hotel to manav udyog in nunihai.
Zone-1 chhata room no. 50 interlocking work on drain and side track on left side of road from chamunda devi temple behind madhushree hotel to manav udyog in nunihai.
Read moreCleaning/ clearing the inside drains from gate no.14 to gate no.7 along the a.l.a. main road (left side) at a.l.a. complex, dispur, guwahati-6 (part-i)
Cleaning/ clearing the inside drains from gate no.14 to gate no.7 along the a.l.a. main road (left side) at a.l.a. complex, dispur, guwahati-6 (part-i)
Read moreof your Industry type