Tender Details

Particulars Details
Title
Const Of Both Side C.C Drain At Uma Nagar 6 Th Lane At Ward No. 37.
Description
Const Of Both Side C.C Drain At Uma Nagar 6 Th Lane At Ward No. 37.
Organisation Government of Odisha
Tender Id 2023_ORULB_94705_207
Reference
Number
BMC (BAM)/281/2023-24
Tender Fee 7080
EMD 22389
Tender Value -
Place BERHAMPUR MUNICIPAL CORPORATION, BERHAMPUR
Link
View Original Tender Notice

https://tendersodisha.gov.in

Start Date September 27, 2023 20:30
End Date
Expired 12/10/2023

Expired 1095 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.

Corridor light, shifting and replacement of new panel, vtpn in both side of 1st floor, north & south side of main building and ground floor corridor in dgp side (south wing) of old sectt, patna.

Read more
Construction of c.c. drains on both sides from nagappa irappa madar house to hanamantha gouda sanganagoudra house in chikkumbi village of savadatti taluk

Construction of c.c. drains on both sides from nagappa irappa madar house to hanamantha gouda sanganagoudra house in chikkumbi village of savadatti taluk

Read more
Estimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district

Estimate for mastic asphalt road( bitumen) and both side rcc drain from sarai more to sanjay saree centre , in ward no-26 , under nagar nigam sasaram rohtas district

Read more
Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area

Dismanteling of suspension,both side eye repairing by material filling and grinding and fittment of repaired suspension . total of 10 nos suspension for 9 nos running dumpers and 3 nos running water tanker of dakra ocp nk area

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for ghogha-panjwara road (sh-84): 6-lane (3-lane on each side) at one location in the state of bihar

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for saraiya-motipur road (sh-86) 6-lane (3-lane on each side) at one location in the state of bihar

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for baruna bridge-rasiyari road (sh-88) 6-lane (3-lane on each side) at two locations in the state of bihar

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for udakishanganj-birpur road (sh-91): 6-lane (3-lane on each side) at two locations in the state of bihar

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for manjhi-barauli road (sh-96): 6-lane (3-lane on each side) at one location in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for manjhi-barauli road (sh-96): 6-lane (3-lane on each side) at one location in the state of bihar

Read more
Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for kursela-forbisganj road (sh-77): 6-lane (3-lane on each side) at two locations in the state of bihar

Construction of toll plaza buildings including administration building, control room, electrical & ups room, security building, utility building, toilet block, roads, drainage, water supply, sewerage, fire fighting system, landscaping and other allied civil works for kursela-forbisganj road (sh-77): 6-lane (3-lane on each side) at two locations in the state of bihar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise