🏭 Procurement Opportunity: Overhauling Of Thermal Power Systems 🔧💥 Up Rajya Vidyut Utpadan Nigam Ltd, A State Government Undertaking, Is Seeking Bids For The Comprehensive Overhauling, Testing, Servicing, And Commissioning Of The Marp, Tsp Iii Panels, Solenoid Operated Valve, Fcnrv, Tts, And Annunciation System Of Unit No. 11 At The Obra Thermal Power Station (3x200 Mw). 📅 Bid Submission Deadline: April 06, 2024, 6:00 Pm Tender Fee: Inr 1180 Emd: Inr 8310 Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Complex Power System Overhauls. Detailed Bids Should Include A Methodology For The Overhaul Process, Testing Procedures, Service Specifications, And Commissioning Protocols. Keywords: Power System Overhaul, Thermal Power Station, Marp, Tsp Iii Panels, Solenoid Operated Valve, Fcnrv, Tts, Annunciation System, Up Rajya Vidyut Utpadan Nigam Ltd, State Government Undertaking, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Work Of Overhauling, Testing, Servicing , Commissioning Marp,Tsp Iii Panels, Solenoid Operated Valve, Fcnrv, Tts ,Annunciation System Of Unit No. 11, 3x200 Mw, Btps, Obra
|
Description |
Work Of Overhauling, Testing, Servicing , Commissioning &Amp#X0d
Marp,Tsp Iii Panels, Solenoid Operated Valve, Fcnrv, Tts &Amp#X0d
,Annunciation System Of Unit No. 11, 3x200 Mw, Btps, Obra
|
Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
Tender Id | 2024_RVUNL_918050_1 |
Reference Number |
W-OBR////6000004813_00 |
Tender Fee | 1180 |
EMD | 8310 |
Tender Value | |
Place | OBRA THERMAL POWER STATION |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1586525 |
Start Date | March 16, 2024 14:30 |
End Date |
06/04/2024 ( Expired 457 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of esp controllers, switchgear, rapping motor, rapping mechanism and heater system control of unit no.13 btps obra.
Overhauling of esp controllers, switchgear, rapping motor,&#x0d rapping mechanism and heater system control of unit no.13&#x0d btps obra.
Read moreOverhauling of 0.4kv lt motors of unit no. 13th and common plant auxiliaries of btps obra
Overhauling of 0.4kv lt motors of unit no. 13th and common&#x0d plant auxiliaries of btps obra
Read moreOverhauling of electrical/electronic system of esp of unit no. 3
Overhauling of electrical/electronic system of esp of unit no. 3 of 3x210 mw, atps, anpara
Read moreSupply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Supply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Read moreTtps mech ii tm i unit iii reconditioning of rc valve plug with stem and soft seat of rc valve model no.87 79006 series retrieved from boiler feed pump system
Ttps mech ii tm i unit iii reconditioning of rc valve plug with stem and soft seat of rc valve model no.87 79006 series retrieved from boiler feed pump system
Read moreTtps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26
Ttps mech ii tm i unit iii inspection overhauling and commissioning of butterfly valve actuators for manual operation in condenser system during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii inspection overhauling and commissioning of actuators of boiler feed water deareator system valves during annual overhaul 2025 26
Ttps mech ii tm i unit iii inspection overhauling and commissioning of actuators of boiler feed water deareator system valves during annual overhaul 2025 26
Read moreContract for cleaning and other related work, breaking of big size coal boulders, stone and cleaning of hopper of wagon tippler no. 1 and 2 of coal handling plant (a) of chd-iii, btps of obra thermal projec
Contract for cleaning and other related work, breaking of big size coal boulders, stone and cleaning of hopper of wagon tippler no. 1 and 2 of coal handling plant (a) of chd-iii, btps of obra thermal projec
Read moreWork contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Work contract for replacement of door seal butterfly valve and main inlet valve miv of unit no. 1 and 3 at 3x105 mw,thps i mppgcl
Read moreEstimate for providing gravitational distribution system network for village baloli, paharpur etc for tank no 4 in changer area of anandpur sahib incl. supply, installation, testing, commissioning various valves fittings, air valve all respect
Estimate for providing gravitational distribution system &#x0d network for village baloli, paharpur etc for tank no 4 in changer area of anandpur sahib incl. supply, &#x0d installation, testing, commissioning various valves &#x0d fittings, air valve all respect
Read moreof your Industry type