Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Mp Water Distribution 2024 25 Of Rbmc Between Ch 10/100 To Ch 19/900 Km And Its Subcanals General Civil Work
|
Description |
This Work Has Been Included Under The Action&Amp#X0d
Plan 2024 25 Of The Malampuzha Project To&Amp#X0d
Enable Smooth Water Distribution During This&Amp#X0d
Year2024 25 . The Removal Of All Obstruction&Amp#X0d
And Providing Arrangements For Ensuring&Amp#X0d
Smooth Water Distribution
|
Organisation | Irrigation Department | State Govt. and UT |
Tender Id | 2024_Irrig_694091_1 |
Reference Number |
IRR/PI/TR/3378/2024_5_1_1/1 |
Tender Fee | 555 |
EMD | 5563 |
Tender Value | |
Place | Puthupariyaram |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1081277 |
Start Date | October 03, 2024 22:25 |
End Date |
10/10/2024 ( Expired 256 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreMaintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Maintenance work from km 0/000 to km 57/25 (length 57.25 km) sendhwa to khetia section of nh-752g and from km 34/56 to km 36/00 (length 1.44 km) anjad thikri road section of nh 347b under short term maintenance contract in the state of madhya pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreEmergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 25-26
Emergent repairing work of bblr (sh-11a) from 58.770 km to 58.99 km by providing gsb-iii, wmm layer, bm, p.c. s.c. and side shoulders by jhama moorum consolidation etc. under jangipur sub-division under berhampore division no.-i, p.w.d during 2025-
Read moreEffecting pipeline upgradation to divert gas from seal oil traps of 10 k 105 in lpg plant and fire water line for running ia ig compressors for cooling purpose and mitigate the bottlenecking of higher mp flash gas pressure in gsu at ongc hazira plant
Effecting pipeline upgradation to divert gas from seal oil traps of 10 k 105 in lpg plant and fire water line for running ia ig compressors for cooling purpose and mitigate the bottlenecking of higher mp flash gas pressure in gsu at ongc hazira plant
Read moreLac-ads-providing paving of tiles in anganavadi varnamnagar-improvements to aganavadi varnamnagar road in ward 19 of edathala grama panchayath.-general civil work
Very&#x0d pathetic condition due to waterlogged area .this&#x0d estimate is proposed to upgrade the road&#x0d with 100 mm interlocking tile works and&#x0d provisions for earth filling, gsb, wmm,pcc ,&#x0d dr masonary and naming board are inluded in&#x0d this estimate.
Read more(nib_05) work of uninterrupted water supply to 3 towns and 319 villages of assembly constituency pali sumerpur sojat marwar junction and jaitaran during breakdown in jawai pipeline under budget announcement 2024-25 distt pali
(nib_05) work of uninterrupted water supply to 3 towns and 319 villages of assembly constituency pali sumerpur sojat marwar junction and jaitaran during breakdown in jawai pipeline under budget announcement 2024-25 distt pali
Read moreof your Industry type