Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bhe/Pw/Pur/Mofg Fgd Bal Mech/ Pkg C 2864
|
| Description |
Handling Of Materials At Bhel / Client Stores / Storage Yard, Transportation To Site, Erection, Testing,
Assistance For Commissioning, Trial Operation, Final Painting And Handing Over Of Fgd System Structural Works Of Common Systems
|
| Organisation | Bharat Heavy Electricals Limited (BHEL) |
| Tender Id | 2023_BHEL_29068_1 |
|
Reference Number |
BHE/PW/PUR/MOFG-FGD-BAL-MECH/ PKG-C-2864 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | ONLINE |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in |
| Start Date | September 29, 2023 21:30 |
| End Date |
Expired
07/10/2023
Expired 994 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Stg and aux, boiler and aux, power cycle piping, esp and aux, cw piping, lp piping (including common system lp piping), raw water/yard piping, dg sets and fdps, including common areas of 2x800 mw dvc koderma tpp stage-ii
Erection, testing, commissioning, trial operation and handing over including handling of materials at bhel / clients stores / storage yard and transportation to site, preparation of foundation, ndt, fixing of hangers supports, application of lining
Read moreErection testing commissionin, start up trial operation and handing over of mechanical systems of unit-2 and unit-3 for flue gas desulpherisation (fgd) system of 3x660 mw stage-i ntpc barh project bihar
Erection testing commissionin, start up trial operation and handing over of mechanical systems of unit-2 and unit-3 for flue gas desulpherisation (fgd) system of 3x660 mw stage-i ntpc barh project bihar.
Read moreBhe/pw/pur/mofg-fgd-bal-mech/ pkg-b-2860
Handling of materials at bhel / client stores / storage yard, transportation to site, erection, testing, assistance for commissioning, trial operation, final painting and handing over of fgd system unit 2 and piping works
Read moreBhe/pw/pur/ mofg-fgd-bal-mech/pkg-a-2856
Handling of materials at bhel / client stores / storage yard, transportation to site, erection, testing, assistance for commissioning, trial operation, final painting and handing over of fgd system unit 1 and common system
Read moreBhe/pw/pur/mofg-fgd-bal-mech/ pkg-a2833/b2834
Handling of materials at bhel / client stores / storage yard, transportation to site, erection, testing, assistance for commissioning, trial operation, final painting and handing over of fgd system unit 1 ,2 and common system
Read moreEtc of mechanical system for fgd system at kahalgaon stps, bihar
Erection testing, commissioning start up trial operation and handing over of mechanical systems for flue gas de sulpherisation (fgd) system of 4x210 mw stage-i and 3x500 mw stage-ii ntpc kahalgaon stps bihar
Read moreSupply, transportation, assembly, testing, commissioning and demonstration to handling and handing over of 02 no. drone - unmanned aerial vehicle one each for two projects (bhel sipat and koderma site).
Supply, transportation, assembly, testing, commissioning and demonstration to handling and handing over of 02 no. drone - unmanned aerial vehicle one each for two projects (bhel sipat and koderma site).
Read moreBalance activities of handling at site stores / storage yard, transportation to site of work, pre-assembly, erection, and testing of boiler and aux. structural, insulation and associated works, cladding , sheeting, etc. at 1 x 660 mw unit-5, sagardig
Balance activities of handling at site stores / storage yard, transportation to site of work, pre-assembly, erection, and testing of boiler and aux. structural, insulation and associated works, cladding , sheeting, etc. at 1 x 660 mw unit-5, sagardig
Read moreDesign, engineering, manufacturing, supply, erection, testing, commissioning, trial operation, air balancing and handing over air handling units for maintenance building ground floor, control building ground floor and other associated works at fbtr.
Design, engineering, manufacturing, supply, erection, testing, commissioning, trial operation, air balancing and handing over air handling units for maintenance building ground floor, control building ground floor and other associated works at fbtr.
Read moreExecution of tray work, cable laying, termination, and junction box installation including handling at site/store, transportation to site of work, complete erection, testing, commissioning, and handing over for 1x660 mw, phase-iii, unit-5, sagardighi
Execution of tray work, cable laying, termination, and junction box installation including handling at site/store, transportation to site of work, complete erection, testing, commissioning, and handing over for 1x660 mw, phase-iii, unit-5, sagardighi
Read moreof your Industry type