Tender Details
Particulars | Details |
---|---|
Title |
Generalcrds Wd Lbmc Clearing And Removing Floating Materials During Water Distribution Of Lbmc Between Ch 11 200 Km To Ch 14 000 Km Edakunny Branch Canal And Its Distributory Meloor South Branch Canal And Its Distributory For The Year 2023 24 G
|
Description |
Clearing And Removing Floating Materials During Water Distribution
|
Organisation | Government of Kerala |
Tender Id | 2023_Irrig_592092_1 |
Reference Number |
IRR/PII/TR/2524/2023_5_1_1/1 |
Tender Fee | 555 |
EMD | 4003 |
Tender Value | |
Place | o/o Asst Exe Engineer Irrigation sub divi2 Chalaku |
Link | https://etenders.kerala.gov.in |
Start Date | August 02, 2023 22:30 |
End Date |
14/08/2023 ( Expired 638 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Deposit-kyip 2023-24-construction of mampoyil ulliyeri south canal road in ulliyeri grama panchayath(canal inspection road between ch. 2/108 km and ch. 2/235 km of narath distributory)-general civil work
Deposit-kyip 2023-24-construction of&#x0d mampoyil ulliyeri south canal road in ulliyeri&#x0d grama panchayath(canal inspection road&#x0d between ch. 2/108 km and ch. 2/235 km of&#x0d narath distributory)-general civil work
Read moreDeposit-deposit works-kyip 2024-25 construction of koomundapoyil anganvadi road between ch 14/640 km and 14/700 km of iringal branch canal in thikkodi grama panchayath.-general civil work
Kyip 2024-25 construction of koomundapoyil anganvadi road between ch 14/640 km and 14/700 km of iringal branch canal in thikkodi grama panchayath.-general civil work
Read moreKipo and mannual maintanence of canals 20242025jungle clearence and removal of floating bos during water distribution from enathu iii distributory between ch0m to 2824m and its 9 field boothiesgeneral civil work
Kipo and mannual maintanence of canals 20242025jungle clearence and removal of floating bos during water distribution from enathu iii distributory between ch0m to 2824m and its 9 field boothiesgeneral civil work
Read moreGeneral action plan 2024 25 kip o and m rectification works of sasthamcotta branch canal between ch 9500m to 9700 m and between ch 10300 m to 10800m in erathu panchayath inorder to pr the seepage during water distribution general civil work
General action plan 2024 25 kip o and m rectification works of sasthamcotta branch canal between ch 9500m to 9700 m and between ch 10300 m to 10800m in erathu panchayath inorder to pr the seepage during water distribution general civil work
Read moreDeposit-kyip-2024-25-melady block panchayath -nadukandy kshethram kolliyil mukk road in between ch 5/000 and 5/200 km of naduvathur branch canal in meppayur grama panchayath-general civil work
Deposit-kyip-2024-25-melady block&#x0d panchayath -nadukandy kshethram kolliyil&#x0d mukk road in between ch 5/000 and 5/200 km&#x0d of naduvathur branch canal in meppayur&#x0d grama panchayath-general civil work
Read moreGeneral-kyip acp(np) 2024-25-clearing jungle and desilting of kakkodi branch canal b/w ch 0/000 km and 10/000 km and its fbs-general civil work
General-kyip acp(np) 2024-25-clearing&#x0d jungle and desilting of kakkodi branch canal&#x0d b/w ch 0/000 km and 10/000 km and its&#x0d fbs-general civil work
Read moreGen kip lb annual maintenance of canals removal of floating materials from canals manning and operation of li pumps chirakkara under the jurisdiction of section 30 19 kottiyam in connection with water distribution during the year 24 25 gen civ work
Gen kip lb annual maintenance of canals removal of floating materials from canals manning and operation of li pumps chirakkara under the jurisdiction of section 30 19 kottiyam in connection with water distribution during the year 24 25 gen civ work
Read moreGeneral-mp-2024-25-renovation works to the mankara branch canal from ch 5/850 km to 5/900 km-general civil work
Mankara branch canals side walls-cut and&#x0d cover portion- were damaged during the 2023-&#x0d 2024 water distribution for the second crop&#x0d period and the well at 6/000 km of mankara&#x0d branch canal were blocked. the block was&#x0d removed and water distribution
Read moreGnrl action plan 2024 25 kip lb annual maintenance of canals removal of floating materials and other debris from canals under the jurisdiction of section 28 19 kottiyam in connection with water distribution during the year 2024 25 gnrl civil wrk
Gnrl action plan 2024 25 kip lb annual maintenance of canals removal of floating materials and other debris from canals under the jurisdiction of section 28 19 kottiyam in connection with water distribution during the year 2024 25 gnrl civil wrk
Read moreGeneral-kyip acp (np) 2024-25-clearingand desilting of maniyur branch canal between ch 6/000 km and ch 10/690km-general civil work
Kyip acp (np) 2024-25-clearingand desilting of maniyur branch canal between ch 6/000 km and ch 10/690km
Read moreof your Industry type