Tender Details
Particulars | Details |
---|---|
Title |
Laying And Fitting Of Hdpe Pipe 6inch Dia (1500 Length) From 16 Ed To 8 Wd In 29 L And 29 L To 52 L Of 7 Dip For Depillaring Of Bsp 7,9,10 Depillaring Panel In Rvi Seam At 3 No Of J. K. Nagar (R) Colliery
|
Description |
Laying And Fitting Of Hdpe Pipe 6inch Dia (1500 Length) From 16 Ed To 8 Wd In 29 L And 29 L To 52 L Of 7 Dip For Depillaring Of Bsp 7,9,10 Depillaring Panel In Rvi Seam At 3 No Of J. K. Nagar (R) Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_302030_1 |
Reference Number |
SS/GM/AMPCD/23-24/PL/JKN/838 Date 16.02.2024 |
Tender Fee | 0 |
EMD | 10900 |
Tender Value | |
Place | Satgram |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=312880 |
Start Date | February 21, 2024 22:30 |
End Date |
02/03/2024 ( Expired 414 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ms structural gang way cum bridge for crossing 250 mm dia (hdpe) in between node no 350 to 360 for laying of distribution main for chenchurgerya pwss under jhargram block under jhargram division p.h.e dte. under jhargram division p.h.e.dte.(length 23
Ms structural gang way cum bridge for crossing 250 mm dia (hdpe) in between node no 350 to 360 for laying of distribution main for chenchurgerya pwss under jhargram block under jhargram division p.h.e dte. under jhargram division p.h.e.dte.(length 23
Read moreLaying of 110mm dia hdpe pipe line from
Laying of 110 mm dia hdpe pipe line from tekumatla mahender (h) to tekumatla venkataiah (h), nagaraboina parvathamma (h) to keshaboina saraiah (h),keshaboina suman (h) to keshaboina kiran (h), open well to baya kumar (h), gaddhala ramadevi (h) to bajjuri suresh (h) to kaitha ranjitha (h), dumpoju ravinder (h) to pittala swamy (h) and power bore to ohsr , ohsr tank to quartars and internal lanes at unikicherla in division no 64.
Read moreErection of tanker filling point to provide regular water supply to the water tanker to sprinkle the water all over the mine at water discharge point, laying of dwc hdpe 90 mm pipe (76 mm internal dia.) pipe from discharge point of delivery line of r
Erection of tanker filling point to provide regular water supply to the water tanker to sprinkle the water all over the mine at water discharge point, laying of dwc hdpe 90 mm pipe (76 mm internal dia.) pipe from discharge point of delivery line of r
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreConstruction of 08 (eight) nos. ventilation stopping to establish ventilation circuit for proposed 04d/29l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of 08 (eight) nos. ventilation stopping to establish ventilation circuit for proposed 04d/29l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreConstruction of 09 (nine) nos. isolation stopping (0.5m thick cement brick work) to isolate the proposed depillaring panel 6f in kenda (r-vi) seam of parasea colliery under kunustoria area
Construction of 09 (nine) nos. isolation stopping (0.5m thick cement brick work) to isolate the proposed depillaring panel 6f in kenda (r-vi) seam of parasea colliery under kunustoria area
Read moreTransportation and installation of 1000 gpm pump with motor at 1dip/84 l main dip sump including transportation, laying and joining of 6 inch delivery pipe line from 1dip/50l to 1dip/84l and 50l east district in seam 1 combined (top seam) at gayatri
Transportation and installation of 1000 gpm pump with motor at 1dip/84 l main dip sump including transportation, laying and joining of 6 inch delivery pipe line from 1dip/50l to 1dip/84l and 50l east district in seam 1 combined (top seam) at gayatri
Read moreConstruction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Construction of 15 nos ventilation stopping by brick from 0d to 10ed in between 33l and 34l and 34l to 37l in between 10ed and 11ed of proposed panel e2 bott dep stow district in working of rvi chora seam for chora 7 and 9 pit colliery under kenda ar
Read moreRenovation of one (01) no. vertical borehole in stowing bunker no. 2 (used for sand stowing) of 133m. depth and 150mm. dia from surface to kenda (r-vi) working at 25 dip/ 2dip level of parasea colliery under kunustoria area.
Renovation of one (01) no. vertical borehole in stowing bunker no. 2 (used for sand stowing) of 133m. depth and 150mm. dia from surface to kenda (r-vi) working at 25 dip/ 2dip level of parasea colliery under kunustoria area.
Read moreTransporting installation and commissioning of 7 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Transporting installation and commissioning of 7 stage 1000 gpm centrifugal pump with power setup and water delivery range to surface in rvi seam of cm project at nakrakonda kumardihi b colliery under bankola area.
Read moreof your Industry type