Tender Details

Particulars Details
Title
Fabrication Of Movable Flange (Universal Joints) 12 Inch Dia. Of H.T. Pumps To Be Installed On Pontoons During Monsoon 2025 In Amlohri Mines
Description
Fabrication Of Movable Flange (Universal Joints) 12 Inch Dia. Of H.T. Pumps To Be Installed On Pontoons During Monsoon 2025 In Amlohri Mines
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_331847_1
Reference
Number
AML/SO/ENM/ETN/25/622
Tender Fee 0
EMD 3100
Tender Value
Place Amlohri Project, NCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344016
Start Date March 11, 2025 14:30
End Date

21/03/2025 ( Expired 32 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Fabrication with fixing/grouting of i love (symbol) bundia mines(made of 3mm thick acp and acrylic 3 dimensional letters installed on 4 nos. of ms square grid) in bundia mines under rampur sub-area of orient area

Fabrication with fixing/grouting of i love (symbol) bundia mines(made of 3mm thick acp and acrylic 3 dimensional letters installed on 4 nos. of ms square grid) in bundia mines under rampur sub-area of orient area

Read more
Operation and maintenance of 08 mld sewage treatment plant based on sbr technology in bbmb colony at talwara township during the year 2025-26 (01/04/2025 to 31/03/2026) or from the date of actual of work

Operation and maintenance of 08 mld sewage treatment plant based on sbr technology in bbmb colony at talwara township during the year 2025-26(01/04/2025 to operation and maintenance of 08 mld sewage treatment plant based on sbr technology in

Read more
Laying and jointing of 8 inch dia m s pipeline for dewatering of mines during upcoming monsoon

Laying and jointing of 8 inch dia m s pipeline for dewatering of mines during upcoming monsoon

Read more
Laying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area

Laying and jointing of 10 inch dia m s pipeline for dewatering of mines during upcoming monsoon w.r.t. konar exp. ocp, bnk area

Read more
Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026-reg

Ktps-v-tm-online arresting of various gland leaks, steam/feed water leaks from various valve flanges and welding joints in pipe lines while unit is in-service pertaining to unit-9 and 10 turbine maintenance of ktps-v stage (2x250mw) during the fy 2025-2026

Read more
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.

Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.

Read more
Shifting, installation and commissioning of ht and lt pumps sets with related accessories at different locations in mines during monsoon and non-monsoon period 2025-26 at khadia project

Shifting, installation and commissioning of ht and lt pumps sets with related accessories at different locations in mines during monsoon and non-monsoon period 2025-26 at khadia project

Read more
Transportation, laying and dismantling of pipeline for dewatering in mines during monsoon and non monsoon period 2025-26 at khadia project

Transportation, laying and dismantling of pipeline for dewatering in mines during monsoon and non monsoon period 2025-26 at khadia project

Read more
Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.

Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.

Read more
R and m of water supply pumps under sub division-iv, cd, apwd, diglipur during 2025-26. sw- providing services of drm for a period of 12 months for operation of water pumps 14-04-2025 to 31-03-2026

R and m of water supply pumps under sub division-iv, cd, apwd, diglipur during 2025-26. sw- providing services of drm for a period of 12 months for operation of water pumps 14-04-2025 to 31-03-2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise