Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
S.I.T.C. Of Grid Interactive Roof Top Solar Power Plant For The Following Branch Offices Under Divisional Office Kozhikode (Cluster 1) 1. Cbo I Kozhikode 50 Kwp, 2. Cbo 3 Kozhikode 30 Kwp, 3. Perambra 10 Kwp, 4. Koyilandy 12 Kwp, 5. Thamarassery 12
|
Description |
Sitc Of Solar Pv Plants
|
Organisation | Life Insurance Corporation of India | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 590 |
EMD | 1.17 Lakh |
Tender Value | |
Place | As per tender |
Link |
AAAAAAAAAA Login to view |
Start Date | June 17, 2025 00:15 |
End Date |
07/07/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ssitc of 29 kwp grid connected solar roof top power plant at kadapa airport
Sitc of 29 kwp grid connected solar roof top power plant at kadapa airport
Read moreSurvey, design, fabrication, supply, installation, testing and commissioning of total 113 kw grid connected solar pv power plant with roof-top net metering at 10 various places in district nagpur
Survey, design, fabrication, supply, installation, testing and commissioning of total 113 kw grid connected solar pv power plant with roof-top net metering at 10 various places in district nagpur
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 20 kw of grid connected solar pv power plant under roof-top net metering at 04 offices of deputy superintendent, land records (bhumi abhilekh) under bhandara district
Design, fabrication, supply, installation, testing and commissioning of total 20 kw of grid connected solar pv power plant under roof-top net metering at 04 offices of deputy superintendent, land records (bhumi abhilekh) under bhandara district
Read moreS.i.t.c. of grid interactive roof top solar power plant for the following branch offices under divisional office kozhikode (cluster-1) 1. cbo i kozhikode 50 kwp, 2. cbo-3 kozhikode 30 kwp, 3. perambra 10 kwp, 4. koyilandy 12 kwp, 5. thamarassery 12
Sitc of solar pv plants
Read moreSupplying and erecting (1 ) 20 kw solar on grid roof top power pack plant (2) 16m.motorized highmast (2 nos.) (3) all in one integrated solar street light fittings on octagonal pole in dhavaleshwar mahadev mandir premises at debhegaon tq. kannad
Supplying and erecting (1 ) 20 kw solar on grid roof top power pack plant (2) 16m.motorized highmast (2 nos.) (3) all in one integrated solar street light fittings on octagonal pole in dhavaleshwar mahadev mandir premises at debhegaon tq. kannad
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 270 kw grid connected solar pv power plant under roof-top net metering at district government hospital and district jail (class-1), bhandara, district bhandara
Design, fabrication, supply, installation, testing and commissioning of total 270 kw grid connected solar pv power plant under roof-top net metering at district government hospital and district jail (class-1), bhandara, district bhandara
Read moreDesign, fabrication, supply, installation, testing and commissioning of total 451 kw grid connected solar pv power plant with roof top net metering, 45 n0s. solar street lights and 10 nos. of solar led highmast at 11 various places of dist chandrapur
Design, fabrication, supply, installation, testing and commissioning of total 451 kw grid connected solar pv power plant with roof top net metering, 45 n0s. solar street lights and 10 nos. of solar led highmast at 11 various places of dist chandrapur
Read moreSitc of 145 kwp grid connecting roof top solar power plant without battery backup at lic bo at dhenkanal(20 kwp) talcher(25kwp), jaleswar (25kwp), rairangpur (25 kwp),nuapada (25 kwp), phulbani(20kwp) under cuttack and berhampur do.
Sitc of 145 kwp grid connecting roof top solar power plant without battery backup at lic bo at dhenkanal(20 kwp) talcher(25kwp), jaleswar (25kwp), rairangpur (25 kwp),nuapada (25 kwp), phulbani(20kwp) under cuttack and berhampur do.
Read moreSupply and installation of 5.36 kwp, 48 v, 1200ah roof top solar (solar power plant off grid)
Supply and installation of 5.36 kwp, 48 v, 1200ah roof top solar (solar power plant off grid)
Read moreSupply, installation, testing and commissioning of grid tied 3 phase solar power plant at roof top of irel building for the total capacity of 150 kwp
Supply, installation, testing and commissioning of grid tied 3 phase solar power plant at roof top of irel building for the total capacity of 150 kwp
Read moreof your Industry type