Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
General Fund Construction Of Cc Drains From D.No.87 1362 V N 169 Towards Disposal Drain At Venkatadri Colony In Ward No.19.
|
Description |
Construction Of Cc Drains From D.No.87 1362 V N 169 Towards Disposal Drain At Venkatadri Colony In Ward No.19.
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 743141 |
Reference Number |
6-17/General Fund/EESE/Knl/24-25,dt.10-07-2024 |
Tender Fee | 291 |
EMD | 8199 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | July 13, 2024 23:00 |
End Date |
30/07/2024 ( Expired 319 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Construction of rcc drain at ward no 45 main road conveyer belt to ashok panday house
Read moreConstruction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreConstruction of rcc drain and pcc bearing course at idsmt shop area ward no.40
Construction of rcc drain and pcc bearing course at idsmt shop area ward no.40
Read moreConstruction of drain with precast in navjeevan vihar at ward no 33
Construction of drain with precast in navjeevan vihar at ward no 33
Read moreConstruction of rcc drain with precast from shambhu shukla chakkran shukla house both side at ward no 44
Construction of rcc drain with precast from shambhu shukla chakkran shukla house both side at ward no 44
Read moreof your Industry type