Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Sanitary Landfill Slf 30mx18m And Leachate Tank Under Swaccha Maharashtra Abhiyan U 2 0 Solid Waste Management
|
Description |
Construction Of Sanitary Landfill Slf 30mx18m And Leachate Tank Under Swaccha Maharashtra Abhiyan U 2 0 Solid Waste Management
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id | 2025_DMA_1165328_1 |
Reference Number |
WMC/7/3rd/2024-25 |
Tender Fee | 2270 |
EMD | 34294 |
Tender Value | |
Place | Wai |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2025559 |
Start Date | March 27, 2025 17:00 |
End Date |
03/04/2025 ( Expired 94 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreConstruction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Construction of shed and office cum guard room for separation at trenching ground molimohgaon (augmentation of existing processing facility for solid waste management) mandla dist. mandla (m.p.)
Read moreConstruction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Construction of 2 nos. of 132 kv gss besroli and thanwala along with associated lines and bays under bn-9016002506
Read moreConstruction of proposed 37 tpd municipal solid waste processing plant under swachch bharat mission within suri municipality in birbhum district
Construction of proposed 37 tpd municipal solid waste processing plant under swachch bharat mission&#x0d within suri municipality in birbhum district
Read moreRepair to internal water supply, cleaning of tank and connected sanitary fittings (zone-i) area at ins chilka under ge chilka
Repair to internal water supply, cleaning of tank and connected sanitary fittings (zone-i) area at ins chilka under ge chilka
Read moreRepair to internal water supply,cleaning of tank and connected sanitary fittings (zone-ii) area at ins chilka under ge chilka
Repair to internal water supply,cleaning of tank and connected sanitary fittings (zone-ii) area at ins chilka under ge chilka
Read moreRepair/ replacement of plumbing/ sanitary fitting, flooring, tilling and connected b/r work at mh area under ge (u) e/m meerut cantt.
Repair/ replacement of plumbing/ sanitary fitting, flooring, tilling and connected b/r work at mh area under ge (u) e/m meerut cantt.
Read moreRepairs/ renewal of oh line, lt ug cable, replacement of u/s lt pole, restriging of oh line cutting of tree branches and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, safilguda pkt-2, assay line and adjoining area under age em ii of ge
Repairs/ renewal of oh line, lt ug cable, replacement of u/s lt pole, restriging of oh line cutting of tree branches and allied works at div unit area, 54 idsr, 554 asc, 654 eme bn, safilguda pkt-2, assay line and adjoining area under age em ii of ge
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreof your Industry type