Tender Details

Particulars Details
Title
Fdr/Re Carpeting Of Road From Amarpur(fatik Sagar) To Chabimura (From Ch. 4.00 Km To 4.04 Km, 4.50 Km To 4.55 Km, 7.00 Km To 7.60 Km) Under Pwd(rand B) Amarpur Sub Division I During The Year 2024 25/Sh Re Construction Of Embankment, Granular Sub Bas
Description
Fdr/Re Carpeting Of Road From Amarpur(fatik Sagar) To Chabimura (From Ch. 4.00 Km To 4.04 Km, 4.50 Km To 4.55 Km, 7.00 Km To 7.60 Km) Under Pwd(rand B) Amarpur Sub Division I During The Year 2024 25/Sh Re Construction Of Embankment, Granular Sub Bas
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 2024_CEPWD_54678_1
Reference
Number
92/NIT/SE-III/R/2024-25
Tender Fee 4000
EMD 1.5 Lakh
Tender Value
Place Amarpur,Gomati Tripura
Link https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=55549
Start Date November 13, 2024 22:10
End Date

22/11/2024 ( Expired 218 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)

Mtc of road from jirania market (aa road) to mandwi road via dushmanta narayan para (l 1.77 km) during the year 2025-26 sh patch metalling, grouting, re-carpeting, road side pucca drain and other allied works. (l 1.00 km, ch.0.00 km to ch.1.00 km)

Read more
Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Mtc. of road from ranirbazar motorstand to durganagar (upto durganagar school) under jirania sub- division pwd (r and b)(l 1.40 km) during the year 2025-2026 sh grouting, re-carpetting, seal coat, etc. (l 0.60 km, from ch.0.00 mtr to ch.600.00

Read more
Periodical repair of pwd road from radhanagar to dumrakaridok(l-1.20km) during the year 2025-26/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 1.20km.

Periodical repair of pwd road from radhanagar to dumrakaridok(l-1.20km) during the year 2025-26/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 1.20km.

Read more
Urgent maintenance of pwd road from asrai bazar to wabwsa kami(l-2.25km) during the year 2025-26/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 2.25km.

Urgent maintenance of pwd road from asrai bazar to wabwsa kami(l-2.25km) during the year 2025-26/sh patch wbm-3, carpeting, unlined surface drains etc. complete ch. from 0.00km to 2.25km.

Read more
Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Improvement of brick soled road to all weather road during the year 2025 26 sh construction of road from the ho dulal roy to nirmal ch roy by providing gsb, wbm ii, paver block, r wall etc. under central v sub division. l 0.130 km

Read more
Maintenance of road from tk road to kalyanpur pwd office via market-0.50 km) under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh-patch metalling, re-carpeting, etc. during the year 2025-26.

Maintenance of road from tk road to kalyanpur pwd office via market (l-0.50 km) under the jurisdiction of kalyanpur pwd(randb) sub-division. / sh-patch metalling, re-carpeting, etc. during the year 2025-26.

Read more
Fdr/jurisdiction mtc. of different roads under jatanbari sub-division,pwd (randb) /sh-patch metalling,patch re-carpeting, grouting, sand seal coating,surface drains,wire crates,land slide clearance, bats filling,protection work etc. during the year

Fdr/jurisdiction mtc. of different roads under jatanbari sub-division,pwd (randb) /sh-patch metalling,patch re-carpeting, grouting, sand seal coating,surface drains,wire crates,land slide clearance, bats filling,protection work etc. during the year

Read more
Fdr/mtc. of different roads under amarpur nagar panchayat during the year 2025-26/ sh-construction of rcc drain infront of pwd(randb) division and shantipalli sribash saha house to pradip das house and box culvert at cremation road etc.

Fdr/mtc. of different roads under amarpur nagar panchayat during the year 2025-26/ sh-construction of rcc drain infront of pwd(randb) division and shantipalli sribash saha house to pradip das house and box culvert at cremation road etc.

Read more
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)

Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)

Read more
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise