Urgent Repairing Works Of 33 Kv Switchyard At Primary Sub Station No. 1, Nehu Campus, Shillong. Phase I
Description
Urgent Repairing Works Of 33 Kv Switchyard At Primary Sub Station No. 1, Nehu Campus, Shillong. Phase I
Organisation North-Eastern Hill University (NEHU) | Central Govt. Ministry/Department
Tender Id 2025_NEHU_843486_1
Reference
Number
CD/ESTM/4516/2024- 341 dated- 08/01/2025
Tender Fee 500
EMD 10000
Tender Value
Place NEHU, Shillong.
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=886614
Start Date January 09, 2025 15:30
End Date

16/01/2025 ( Expired 173 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Civil works of pre-cast rcc cover slab and other miscellaneous works for cable trench at 132 kv switchyard area within ipr campus, bhat, gandhinagar -382428.

Civil works of pre-cast rcc cover slab and other miscellaneous works for cable trench at 132 kv switchyard area within ipr campus, bhat, gandhinagar -382428.

Read more
Civil work for construction of 01 no. 33 kv ais bay for m/s noida international airport pvt. ltd. at 220/33 kv hybrid sub-station jewar

Civil work for construction of 01 no. 33 kv ais bay for m/s noida international airport pvt. ltd. at 220/33 kv hybrid sub-station jewar

Read more
Civil work for construction of 01 no. 220 kv ais bay at 220/33 kv sub station yeida sector-18

Civil work for construction of 01 no. 220 kv ais bay at 220/33 kv sub station yeida sector-18

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.

Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.

Read more
Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d

Water supply scheme at amarpur sub-divisional hospital/ sh- sinking of 01 (one) no. dtw scheme with contractors direct rotary normal drilling rig and related allied works etc. complete at amarpur sub-divisional hospital during the year 2023-24 (d

Read more
Water supply scheme at amarpur sub-division hospital/sh-construction of 1(one) no. semi permanent pump house, providing and laying distribution pipeline in/c. necessary fittings, sluice valves, hydrant post and platforms, supplying and installation o

Water supply scheme at amarpur sub-division hospital/sh-construction of 1(one) no. semi permanent pump house, providing and laying distribution pipeline in/c. necessary fittings, sluice valves, hydrant post and platforms, supplying and installation o

Read more
Work of replacement of damaged gasket of hv/lv bushings and turrets and attending leakage from oil pipelines of 132/33kv, 40 mva t/f-2 (bhel make ) installed at 132 kv sub station sarila under etd hamirpur.

Work of replacement of damaged gasket of hv/lv bushings and turrets and attending leakage from oil pipelines of 132/33kv, 40 mva t/f-2 (bhel make ) installed at 132 kv sub station sarila under etd hamirpur.

Read more
Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda

Construction of 1 no bay and its allied civil works for 66 kv s s jalal at 66 kv s s bhagta bhai ka under op. circle, bathinda

Read more
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl

Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise