Tender Details
Particulars | Details |
---|---|
Title |
Transportation Installation Of One Endless Haulage Complete With Transportation Fitting Of 1200mtr Track Line At Panel 8 Of R Vii Seam At 3 N4 Incline, Jpc
|
Description |
Transportation Installation Of One Endless Haulage Complete With Transportation Fitting Of 1200mtr Track Line At Panel 8 Of R Vii Seam At 3 N4 Incline, Jpc
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_324495_1 |
Reference Number |
ECL/GM/JNR/EnM/A2/24-25/103 dated 25.12.2024 |
Tender Fee | 0 |
EMD | 8100 |
Tender Value | |
Place | JHANJRA UNDERGROUND |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336360 |
Start Date | December 31, 2024 16:30 |
End Date |
10/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply and installation of centrifugal motor pump and vfd panal with complete fitting and wiring at satanwada and madikheda
Design, supply and installation of centrifugal motor pump and vfd panal with complete fitting and wiring at satanwada and madikheda
Read moreRe organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecl
Re organization of track line by installation of track line contractually from 9l to 24l along with contractual supply of dog nail nut bolt and fish plate by laying transportation and fitting of chora block incline colliery under kenda area ecltr
Read moreProviding, installation, testing and commissioning of one no. tubewell size 300mm x 200mm dia with reverse rotary rig upto 200 mtr. 650 feet deep complete in all respect as per approved dnit in public health lab at sangrur distt. sangrur
Providing, installation, testing and commissioning of one no. tubewell size 300mm x 200mm dia with reverse rotary rig upto 200 mtr. 650 feet deep complete in all respect as per approved dnit in public health lab at sangrur distt. sangrur
Read moreSinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Sinking of borewell (200.00 mtr depth) with installation of submersible pump and laying of 75mm dia. hdpe pipe-line (supplying, fitting and fixing) at purshabauripara within ward no-37 under dmc.
Read moreDesign commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick
Design commissioning testing, supply installation of a solar submersible pump with all necessary accessories, including solar pv modules, pump modules, pump motor set, solar panel mounting structure, control unit etc complete job at goma parakachick
Read moreInstallation of 1 nos. submersible tube well and pipe line with all complete near gandhi smrity primary school at uchitpur village under bural g.p.
Installation of 1 nos.&#x0d submersible tube well and pipe&#x0d line with all complete near&#x0d gandhi smrity primary school&#x0d at uchitpur village under bural&#x0d g.p.
Read moreComplete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 gpm motor installation at the new eastern side sump of jocp in the hzb area.
Read moreSupply and installation of complete air compressor alongwith necessary fitting etc. at track hopper of chp-210 mw atps mppgcl chachai .
Supply and installation of complete air compressor alongwith necessary fitting etc. at track hopper of chp-210 mw atps mppgcl chachai .
Read moreInstallation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreRepair/replacment of meter distibution panel at cariappa vihar, micts, 414 asc bn and ftp, r line connected submains and internal wring ceiling fan, exhaust fan, wall fans and electric and solar water heater with connected -- under ge kamptee.
Repair/replacment of meter distibution panel at cariappa vihar, micts, 414 asc bn and ftp, r line connected submains and internal wring ceiling fan, exhaust fan, wall fans and electric and solar water heater with connected -- under ge kamptee.
Read moreof your Industry type