Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pmgsy Package No.An02 Cb02
|
| Description |
Improvement Of Rural Road From Main Road To Late Mangal Singh Field At Ward No. 03 Under Gram Panchayat, Govind Nagar (1.44km) (Pmgsy Package No. An02 Cb02) Sub Head Routine Maintenance Of 2nd Year (Re Call).
|
| Organisation | Chief Engineer Andaman Public Works Department (APWD) | State Govt. and UT |
| Tender Id | 2025_APWD_19990_1 |
|
Reference Number |
No. Quot-DB/CD/CB/2025-26/2361 |
| Tender Fee | 0 |
| EMD | 2000 |
| Tender Value | |
| Place | Executive Engineer CD, APWD, Campbell Bay |
| Link |
View Original Tender Notice
https://eprocure.andamannicobar.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=21170 |
| Start Date | September 19, 2025 00:00 |
| End Date |
Expired
29/09/2025
Expired 263 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction and maintenance of rural roads under pmgsy-iii, batch-i, 2020-21, package no. rj23p301 (remaining work)
Construction and maintenance of rural roads under pmgsy-iii, batch-i, 2020-21, package no. rj23p301 (remaining work)
Read moreConstruction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Construction and maintenance of link road from chamber kanari road km 1.150 to tatkhana , package no. jk11-4051, pmgsy-iv, batch-i of 2026-27 block- mandi district poonch (using waste plastic (length - 2.00 kms)
Read moreRe-conductoring package oh01 (ratle)
Re-conductoring package oh01 associated with transmission scheme for evacuation of power from ratle hep (850 mw) and kiru hep (624 mw): part-b.
Read moreDevelopment, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read more400kv gis extn substation package ss-157
400kv gis extn substation package ss-157 (including transformer) for (a) extn. of 400kv jeypore (powergrid) s/s under eastern region expansion scheme-49, (b) extn. of 220/132kv purnea (powergrid) s/s and (c) 1 x 200mva, 220/132kv transformer at purnea (powergrid) s/s under eastern region expansion scheme-52
Read moreConstruction of various road under pmgsy iv batch 1 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Construction of various road under pmgsy iv batch 1
 in kalol taluka dist. panchmahal total 3 roads, 5.740 km
Read moreConstruction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Construction of various road under pmgsy-iv batch-1 in halol taluka dist. panchmahal total 4 roads, 4.20 km
Read more765kv gis substation package ss-103t for establishment of 765 kv tuticorin (gh) (gis) s/s
765kv gis substation package ss-103t for establishment of 765 kv tuticorin (gh) (gis) s/s
Read moreConstruction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Construction and maintenance of industrial safety and security etc at bodhjungnagar industrial estate tripura package 18
Read moreof your Industry type