Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Nagpur Gondia Expressway Construction Project 🛣️🚧 The Maharashtra State Road Development Corporation (Msrdc) Is Seeking Bids From Reputable Construction Firms For The Epc (Engineering, Procurement, And Construction) Mode Of The Nagpur Gondia Access Controlled Super Communication Expressway In Package Ng 03. 📅 Bid Submission Deadline: May 09, 2024, 3:00 Pm The Project Encompasses The Development Of A State Of The Art Expressway Aimed At Enhancing Connectivity And Infrastructure In The Region. Interested Bidders Must Submit Their Eo I (Expression Of Interest) Along With The Tender Fee Of Inr 11,80,000 By The Stipulated Date And Time. Keywords: Construction, Nagpur Gondia Access Controlled Super Communication Expressway, Epc Mode, Maharashtra State Road Development Corporation, Msrdc, Infrastructure Development, Tender, Bid Submission, Eo I, Maharashtra State, Mumbai| Particulars | Details |
|---|---|
| Title |
Construction Of Nagpur Gondia Access Controlled Super Communication Expressway In The State Of Maharashtra On Epc Mode Package Ng 03
|
| Description |
Construction Of Nagpur Gondia Access Controlled Super Communication Expressway In The State Of Maharashtra On Epc Mode Package Ng 03
|
| Organisation | Maharashtra State Road Development Corporation | State Govt. and UT |
| Tender Id | 2024_MSRDC_1014757_1 |
|
Reference Number |
T 2738 |
| Tender Fee | 11.8 Lakh |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1775240 |
| Start Date | March 13, 2024 17:00 |
| End Date |
Expired
09/05/2024
Expired 891 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cs for ae for balance work for construction of 8l access controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg viii) 2nd call.
Cs for ae for balance work for construction of 8l access controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg viii) 2nd call.
Read moreBalance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Balance works of 4 lane bangalore chennai expressway from arakkonam to kancheepuram (km 204.500 to km 230.000) (phase iii/package iii) in tamil nadu on epc mode.
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
Development of greenfield high-speed access controlled corridor from shamli-gorakhpur from ch.143.100 to ch.212.600 in the state of uttar pradesh on ham mode (package-3)
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
Development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode (package-6)
Read moreDevelopment of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
Development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode (package-5)
Read moreDevelopment of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
Development of greenfield high speed access controlled corridor from shamli gorakhpur from ch. 84.500 to ch. 143.100 in the state of uttar pradesh on ham mode (package 2)
Read moreDevelopment of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road sprr in ahmedabad gujarat on epc mode
Development of interchange at starting point of ahmedabad dholera expressway meeting with sardar patel ring road sprr in ahmedabad gujarat on epc mode.
Read moreConsultancy services for preparation of detailed project report for development of access-controlled highway/expressway from chandigarh-baddi-shimla in the state of himachal pradesh.
Consultancy services for preparation of detailed project report for development of access-controlled highway/expressway from chandigarh-baddi-shimla in the state of himachal pradesh.
Read moreInfrastructure development project at gauhati university, assam (package-i), on engineering, procurement and construction (epc) mode-1
Infrastructure development project at gauhati university, assam (package-i), on engineering, procurement and construction (epc) mode-1
Read moreDevelopment or construction of entry exit arrangement at 4 lane greenfield expressway spur from delhi vadodara greenfield expressway near bandikui to jaipur section of ne 4c in the state of rajasthan on epc mode.
Development or construction of entry exit arrangement at 4 lane greenfield expressway spur from delhi vadodara greenfield expressway near bandikui to jaipur section of ne 4c in the state of rajasthan on epc mode.
Read moreof your Industry type