Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Complete Repairing And Rewinding Of 150 Hp Induction Motor 550 Volts 1480 Rpm At Victory Section Under Bastacolla Colliery
|
Description |
Complete Repairing And Rewinding Of 150 Hp Induction Motor 550 Volts 1480 Rpm At Victory Section Under Bastacolla Colliery
|
Organisation | Bharat Coking Coal Limited | Public Sector Undertakings |
Tender Id | 2025_BCCL_330022_1 |
Reference Number |
BCCL/BA-IX/ENM/24-25/278 22/02/2025 |
Tender Fee | 0 |
EMD | 2100 |
Tender Value | |
Place | BASTACOLLA AREA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342095 |
Start Date | February 24, 2025 14:30 |
End Date |
07/03/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Supply stacking of stone boulder 150-200 mm for pmt works to be supplied at hq ce(p)arunank and old brtf location naharlagun under 119 rcc/756 brtf of project arunank in the state of arunachal pradesh, job no. r-4309/04/756tf
Read moreIndependent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis
Read moreWbpwd/ee/hed/nit- 08 (2nd call) of 2025-2026
Repairing and renovation of electrical installation system at chandipur manikpur rural hospital,staff quarter, under uluberia block-i, howrah.
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreAAAAAAAAAA
Login to viewRepairing of existing fire fighting system at old sdh building at prafulla chandra sen government medical college and hospital, arambagh under hooghly construction sub-division no- ii, p.w.d. under hooghly construction division, p.w.d. during the yea
Read moreSitc of two nos of centrifugal pump having capacity 70 m3/h and induction motor having capacity 100hp and 40 hp for water treatment plant at south campus of iit mandi.
Sitc of two nos of centrifugal pump having capacity 70 m3/h and induction motor having capacity 100hp and 40 hp for water treatment plant at south campus of iit mandi.
Read moreRws / jjm / ridf schemes in north tripura district under 15th fc fund 2025-26/ sh-re-winding of burnt up motor and repairing of different types of pump etc and all allied works of kadamtala block under dws sub-division, dharmanagar
Rws / jjm / ridf schemes in north tripura district under 15th fc fund 2025-26/ sh-re-winding of burnt up motor and repairing of different types of pump etc and all allied works of kadamtala block under dws sub-division, dharmanagar
Read moreRws / jjm / ridf schemes in north tripura district under 15th fc fund 2025-26/ sh-re-winding of burnt up motor and repairing of different types of pump etc and all allied works of kalacherra block under dws sub-division, dharmanagar
Rws / jjm / ridf schemes in north tripura district under 15th fc fund 2025-26/ sh-re-winding of burnt up motor and repairing of different types of pump etc and all allied works of kalacherra block under dws sub-division, dharmanagar
Read moreComplete repairing and re-conditioning of 02 nos. rotary motor (lhs and rhs) part no. 1ps4866 of rel-750 drill machine at nigahi project.
Complete repairing and re-conditioning of 02 nos. rotary motor (lhs and rhs) part no. 1ps4866 of rel-750 drill machine at nigahi project.
Read more8125/sar-t-14/2025-26 provn of concertina coil and allied works on boundary wall and main gate of er-ii section at af stn sarsawa under ge (af) sarsawa
Provn of concertina coil and allied works on boundary wall and main gate of er-ii section at af stn sarsawa under ge (af) sarsawa
Read moreof your Industry type