Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Spares For San Locomotives 7 8 9 Of Coal Handling Plant 1 Item
|
| Description |
Procurement Of Spares For San Locomotives 7 8 9 Of Coal Handling Plant 1 Item
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_402279_1 |
|
Reference Number |
CE/MTPS-II (600MW)/S I/AEE-1/OT.No.117-S /23-24 |
| Tender Fee | 0 |
| EMD | 27100 |
| Tender Value | |
| Place | Office of EE SI MTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | December 21, 2023 23:30 |
| End Date |
Expired
08/01/2024
Expired 892 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Set of spares of brush holder assly hitachi traction motor (consisting two item ) a) spacer -216 nos./set b) serated washers 36 nos./set specification :- clw drg. 2twd-095-090 alt. 7 with latest item no.4 &7
For complete deion and other details, please refer to tender
Read moreInter vehicular coupler (iv coupler) socket assembly (complete set) for wap-7 electric locomotives specification- rdso spec: rdso/pe/spec/ac/0177-2013 rev 1 with latest rev
For complete deion and other details, please refer to tender
Read moreRecarpeting of vigyan path from jn12 to jn7 upto t point v3 roads dividing se 6 26 sec 6 7 sec 5 8 sec 4 9 sec 3 10 sec 2 11 ut chandigarh
Recarpeting of vigyan path from jn12 to jn7 upto t point v3 roads dividing se 6 26 sec 6 7 sec 5 8 sec 4 9 sec 3 10 sec 2 11 ut chandigarh
Read moreSet of 3 stands for tm and gear case assembly and testing as per drawing no.ubl/el/ut/0325-1a. each consists of item no.1 stand for tm-1no. item no.2 stand for wheel set-2nos
For complete deion and other details, please refer to tender
Read moreReplacement of damaged / rusted existing water supply pipeline (non-di) with di pipe (k-7 / k-9 grade) to pr contamination of drinking water in ward no. 18, division-1b, zone-1, municipal corporation gurugram.
Replacement of damaged / rusted existing water supply pipeline (non-di) with di pipe (k-7 / k-9 grade) to pr contamination of drinking water in ward no. 18, division-1b, zone-1, municipal corporation gurugram.
Read moreOutsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9 (phase i) including charkop and mandale depot for three years
Outsourcing of usfd testing of at welds at nominated sections of line 2a, line 2b (phase i), line 7 and line 9&#x0d (phase i) including charkop and mandale depot for three years
Read moreHand operated pneumatic barrel pump, capacity 200lts.the specifications are (1)material construction-al,ss, ms, pvdf, telfon, polypropylene, conductive plastic carbon steel, chlorinated polyvinayl chloride.(2)max.pressure-15psi, (3)air inlet, in.npt(f)-others. (4)capacity-200lts. (5)outlet size-20mm. (6)shut of head-5mts. (7)inlet size-25mm (8)product type-hand operated (9)tube length-225mm. (10)max flow-10lpm. (11)application-for barrel emptying drum applications to remval diesel, industrial
For complete deion and other details, please refer to tender
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g 1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitatio
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g p1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitation camp2025-2026 pappi
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 161 to 248 houses (8 houses (g 1) -11 units - ne side) including the leveling of site pkg.no. tn04-03 / srilankan rehabilita
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 161 to 248 houses (8 houses (g plus 1) -11 units - ne side) including the leveling of site pkg.no. tn04-03 / srilankan rehabilitation 2025-2026
Read moreof your Industry type